Similar Projects
Parking Lot Maintenance Services
Post-Bid
CO

Climbing Access Trail Construction
Post-Bid
CO

2020 Infrastructure Improvement Program
Results
Greeley, CO 80631

Copper Ridge Connector Trail
Results
Loveland, CO

Pressure Washing for Downtown Area 2021
Post-Bid
Fort Collins, CO 80524

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

Myec Zuni Parking Lot and HVAC
Post-Bid
Denver, CO 80211

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

2021 Concrete Replacement
Post-Bid
Breckenridge, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Managed Parking
Post-Bid
Green Mountain Falls, CO

Homestead Trail Project
Results
Less than $100,000 est. value
Colorado Springs, CO 80917

Handicap Ramp Sidewalks Parking
Post-Bid
Lamar, CO

Citizen Requested Sidewalks
Results
Less than $50,000 est. value
Pueblo, CO

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Reported 05/26/2022 12:00 AM
Project Title

South Hotels Trail Connection

Physical Address View project details and contacts
City, State (County) Steamboat Springs, CO   (Routt County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction and installation of a two new concrete sidewalk section of varying width to the west of the Fairfield Inn/Storm Peak Apartments and a connection to the Walton Creek Secondary Trail to the north of Stone Lane. The work also includes but is not limited to the installation of concrete sidewalks, clearing and grubbing of the site, potential subgrade stabilization, preparation of pavement subgrades and base courses, localized drainage infrastructure, and landscaping.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents