Similar Projects
Reported | 09/03/2022 12:00 AM |
Project Title | RFQ - Indefinite Delivery Indefinite Quantity Architect-engineering Services for Preparation of Us Navy and Marine Corps Environmental Planning Documents Primarily |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA 92101 (San Diego County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | Bidding, |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | THIS IS A SMALL BUSINESS SOURCES SOUGHT ANNOUNCEMENT FOR MARKET RESEARCH TO BE USED FOR PRELIMINARY PLANNING PURPOSES ONLY. The information received will be used within the Navy to facilitate the decision making process and will not be disclosed outside of the agency. The intent of this Sources Sought is to identify potential qualified U.S. Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone); 8(a) Small Disadvantaged Business firms; Service Disabled Veteran-owned Small Business; Women-Owned Small Business firms; Veteran-Owned Small Business; and/or Small Business Concerns capable of providing A-E Environmental Design and Engineering Services to prepare Navy and Marine Corps environmental planning-related documents/tasks. The North American Industry Classification System (NAICS) Code: 541620, Environmental Consulting Services. The Small Business Size Standard: $16.5M. Naval Facilities Engineering Systems Command, Southwest is seeking sources with current relevant qualifications, experience, personnel, and capability to provide, under contract, all management, labor, incidental engineering, travel, transportation, equipment, material, and supervision necessary in performing A-E Environmental Design and Engineering Services to prepare Navy and Marine Corps environmental planning-related documents/tasks. The primary focus would be for the National Environmental Policy Act (NEPA) and other environmental planning related projects in any environment. Efforts include but are not limited to, Environmental Assessments (EAs); Environmental Impact Statements (EISs); draft Findings of No Significant Impact (FONSIs) and draft Record of Decisions (RODs) in accordance with the prices, terms and conditions in the schedule. Tasks may include the data collection, natural resource studies/surveys, and resource effects analysis work related to NEPA and other environmental planning tasks. These NEPA related documents would address the following resource areas, as applicable for each project: topography, geology and soils; water resources; biological resources; air quality, greenhouse gasses and climate change; noise; airspace; cultural resources; socioeconomics (including environmental justice); land use; coastal zone management (Coastal Zone Management Act compliance); transportation/traffic; utilities and utility corridors; public health and safety (including hazardous materials, protection of children from environmental health risks and safety risks, and anti-terrorism and force protection); visual quality; public services; and other important resource areas and considerations. As part of, or in addition to, preparing NEPA related documents including EAs, EISs, draft FONSIs, and draft RODs, the Contractor may conduct other environmental studies and prepare other environmental planning related documents including, but not limited to the following categories: Plans, Studies and Preliminary Designs; Aeronautical Related Studies/Projects; Biological Resources Effects Analyses; Topography, Geology and Soils Effects Analyses; Air Quality/Climate Change Effects Analyses; Noise Effects Analyses; Cultural Resources Effects Analyses; Water Quality and Hydrology Effects Analyses; Socioeconomics and Community Services Effects Analyses; Land Use Effects Analyses; Coastal Resources Effects Analyses; Transportation/Traffic Effects Analyses; Utilities Analyses; Public Health and Safety Effects Analyses; Visual Quality Effects Analyses; Project Public Participation Planning and Implementation; and Other Important Considerations. The Area of Responsibility is CALIFORNIA, NEVADA, and ARIZONA; however, there is the possibility of work being located anywhere in the United States when that work comes under the responsibility of Naval Facilities Engineering Systems Command (NAVFAC). Services required shall be in accordance with this contract, OPNAVINST M-5090.1, Navy Instructions and Guidance on Procedures for Implementing NEPA, Marine Corps Order (MCO) 5090.2 (June 2018), Environmental Compliance and Protection Manual, the Unified Facilities Criteria (UFC) 3-800-10N (Draft) General Environmental Requirements, and the Guide for Architectural-Engineering Firms (A-E Guide) dated Jan 2000, National Environmental Policy Act (NEPA), and Council of Environmental Quality (CEQ) Regulations. Multiple years of performance are anticipated for the planned contract, via the use of option periods per FAR Subpart 17.2 procedures. The Government anticipates a combination of Firm-Fixed-Price, as well as Indefinite-Delivery, Indefinite-Quantity projects. Task Orders are anticipated to range from $50,000 to $3,000,000. The Government will use responses to this Sources Sought synopsis to make acquisition plans. This is not a Solicitation Announcement and not a Request for Proposal. After review of the responses, if the Government plans to proceed with a Solicitation, then a Solicitation Announcement will be published to the Government-wide Point of Entry at https://beta.sam.gov for regulatory compliance. Interested firms (including Joint Ventures/Subcontractors/Teams) must demonstrate knowledge and experience in all the services cited above and have the ability to obtain appropriate security clearances to access military sites/property/installations. SUBMISSION REQUIREMENTS: Responses to this Sources Sought shall be sent electronically (with no hard copies) to email inbox at: Dalisay.a.cortez.civ@us.navy.mil by the closing date of this synopsis. Files are required to be in Adobe Acrobat format (.pdf), and shall not exceed fifteen (15) pages in length and will be prepared using Times New Roman font no smaller than 12 pitch font. Please include the following information in your response: Provide a one (1) page cover sheet that MUST include: Contractor name, address, primary phone number Contractor and Government Entity (CAGE) Code Contractor's status and size of the business relative to NAICS code 541620 Two Points of Contact with telephone numbers and email addresses Short description of the contractor's history including years in business, number of employees, and main disciplines/experience areas of the contractor Office locations Provide no more than fourteen (14) pages demonstrating the ability to perform the requested services. This documentation shall address, at a minimum, the following: Relevant experience in the preparation of environmental planning documents that were completed within the last five (5) years for actions located in Arizona, California, and Nevada. Include contract number, description of the work performed, indication if work was done as a prime or subcontractor, contract value, Government/Agency point of contact and current telephone number, and a brief description of how the contract referenced relates to the services described herein. Provide copies of any and all Small Business certifications including those issued by the Small Business Association (SBA) and those which are derived from self-reported information submitted through the System for Award Management (SAM) portal. Small Business categories include 8(a), HubZone Small Business, Service-Disabled Veteran Owned Small Business, Small Business, Small Disadvantaged Business, Women-Owned Small Business, and Veteran-Owned Small Business. Copies of the SBA Certifications will not be counted in the 15-page limit. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. No telephone calls or emails will be accepted for requests for a bid package or solicitation because there is no bid package or solicitation available at this time. In order to protect the procurement integrity of potential future procurement, if any, that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be accepted. This SOURCES SOUGHT Notice is for Market Research Information and Planning Purposes ONLY and IS NOT to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or ultimately award a contract. An award of a contract will not be made on offers received in response to this notice. This notice is not a Request for Proposal (RFP); it is a market research tool being utilized to determine the availability of sources. No solicitation document exists. If / when the Government decides to proceed with this acquisition, a separate solicitation notice will be issued. The Government will not be offering exchanges of information, site visits, oral presentations, or technical points-of-contact in association with this synopsis. Do not submit any information that was not requested. Responses to this Sources Sought Notice are due no later than 5:00 PM (Pacific Standard Time) on THURSDAY, JULY 21, 2022. Please email your response to Dalisay Cortez at email: dalisay.a.cortez.civ@us.navy.mil. Any questions should be directed to Dalisay Cortez via email. Facsimile submittals will not be accepted. All NAVFAC SW Sources Sought Notices and/or Synopsis are posted on the SAM.gov website at https://sam.gov. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |