Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Northview High School - Wastewater Treatment Plant
Bidding
$600,000 est. value
Century, FL 32535

Greenland Water Reclamation Facility (WRF)
Post-Bid
$100,000,000 est. value
Jacksonville, FL 32202

Wastewater Treatment Facility Filter No. 2 Replacement
Post-Bid
Less than $625,000 est. value
Port Saint Lucie, FL 34986

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Construction Manager at Risk Services - Embassy Hills Wastewater Treatment Plant Rehabilitation and Improvements
Results
$585,000 est. value
Port Richey, FL 34668

New Headworks and Grit Removal Facility
Construction
$11,900,000 est. value
Clearwater, FL 33756

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Wastewater Pump Station Improvements
Design
North Bay Village, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Design-Build GT LOHMEYER WWTP Replacement of Oxygen System Projects 11781 and 11917
Results
Fort Lauderdale, FL 33316

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Construction Management at Risk (CMAR) Services for the Nassau Water Reclamation Facility (WRF) Upgrade Projects
Results
Less than $550,000 est. value
Fernandina Beach, FL 32034

Last Updated 11/29/2021 09:09 AM
Project Title

Waste Water Treatment Facility Digester to Eq Tank Conversion

Physical Address View project details and contacts
City, State (County) Haines City, FL 33844   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor for the following modifications to the Wastewater Treatment Facility: conversion of an existing (abandoned) above ground pre-aeration basin to an equalization tank including installation of four static screens, conversion of three existing digester tanks to equalization tanks, construction, installation and start-up of a factory-fabricated pump station building with two pump stations housed in a single building with variable frequency drives, and associated yard piping, electrical and instrumentation. Influent flows will be directed to the converted pre-aeration basin (EQ Tank No. 101) where the new screens will remove debris and grit from the influent. One pump station (EQ Transfer Pump Station No. 100) will transfer the screened influent from the converted pre-aeration basin (EQ Tank No. 101) to the three digesters converted to EQ tanks (EQ Tank Nos. 201, 202, and 203). The second pump station (EQ Transfer Pump Station No. 200) will transfer the equalized influent from the existing digesters converted to EQ tanks (EQ Tank Nos. 201, 202, and 203) to the existing oxidation ditch. The Contractor will also be responsible for electrical design and construction to complete the system, construction of concrete pads, yard piping, penetration of two cast-in-place concrete tanks (EQ Tank Nos. 101 and 201) and two prestressed concrete tanks (EQ Tank No. 202 and 203), and other associated work.

Details

Lift and Pump Stations, Renovation, Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents