Similar Projects
Air Conditioning and Quality Improvements Package 1 - 2022 Bond - Lansing School District
Alteration
Design
$4,100,000 est. value
Lansing, MI

Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

MDOC Southern Region - Business Office HVAC Upgrades
Renovation
Sub-Bidding
$40,000 CJ est. value
Jackson, MI 49201

Proposal A- Kearsley High School Boiler Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Flint, MI 48506

Medical Care Air Handler Unit Replacement
Alteration
Post-Bid
Allegan, MI

HVAC Upgrades Upper Elementary School
Alteration
Post-Bid
Escanaba, MI

62A District Court Rooftop HVAC Unit Replacement
Results
Wyoming, MI 49509

Boiler Replacement
Results
Swartz Creek, MI 48473

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

HVAC Controls Retrofit and Replacement
Renovation
Sub-Bidding
$1,200,000 CJ est. value
Ionia, MI 48846

Maloney Manor RoofTop Make-Up Air Modernization
Alteration
Post-Bid
Bay City, MI 48708

Walk-In Outdoor Cooler/Freezer at Syring Elementary
Results
Swartz Creek, MI 48473

DMVA Boiler Chemicals and Services
Term Contract
Sub-Bidding
Lansing, MI 48933

CBS HVAC Upgrade
Alteration
Post-Bid
Bay City, MI

Installation of Needlepoint Ionization Units
Alteration
Results
Lincoln, MI 48742

Last Updated 11/28/2022 10:32 AM
Project Title

Cardinal Elementary School Controls And Unit Ventilator Replacement

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49442   (Muskegon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,897,550 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Questions pertaining to the controls or unit ventilator upgrades should be directed to Lydia Fries at friesl@progressiveae.com or by calling 616-361-2664 As of 10/04/2022 Estimated cost of $70,000-$80,000 Your firm is invited to submit an offer under seal to Owner for the upgrade of the Controls system and unit ventilator replacement located at 2310 Marquette Ave, Muskegon, MI 49442 Questions pertaining to the controls or unit ventilator upgrades should be directed to Lydia Fries at friesl@progressiveae.com or by calling 616-361-2664 The Owner intents to award the project during the month of October, 2022. G. This project will adhere to Davis Bacon Wage Rates, see current rates published in the project manual. H. Orchard View Public Schools reserves the right to reject any or all proposals; reserves the right to award the contract to a bidding entity other than the low bid entity; reserves all rights granted to it by law; and reserves the right to waive formalities as its interest may require. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents