Similar Projects
WWTF and Pump Stations
New Construction, Renovation
Bidding
Bridgton, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Pumping Station 5 Control Building
Renovation
Post-Bid
Augusta, ME 04330

Sanitary Sewer Pump Station Improvement
Results
Brunswick, ME

Littlejohn Pump Station Improvements
Results
Less than $556,000 est. value
Cape Elizabeth, ME 04107

Pump Station 2 & Passamaquoddy Road Sewer & Water System Improvements
New Construction, Demolition - 17,060 SF
Construction
Perry, ME 04667

Gilpatrick Cove and Garry Moore Pump Station Improvements
New Construction
Post-Bid
Mount Desert, ME

Replacement Pump Station
Renovation
Results
Old Town, ME 04468

Pump Station and Sewer Extension
Post-Bid
Less than $3,810,000 est. value
Poland, ME

Baxter Boulevard Pump Station Upgrades
Renovation
Results
Portland, ME 04103

Wastewater Treatment Facility and Pump Station Upgrades
Renovation
Results
Lincoln, ME

School Street Pump Station Improvements
Results
Unity, ME 04988

Hospital Street Booster Station Upgrades
Results
Augusta, ME 04330

Water Street Pump Station Upgrades Pump Procurement Project
Results
Ellsworth, ME 04605

Kennebec Sanitary District Main Pump Station Force Main Upgrade
Results
$640,000 est. value
Waterville, ME

Last Updated 05/25/2021 10:15 AM
Project Title

North Yarmouth Booster Pump Station

Physical Address View project details and contacts
City, State (County) North Yarmouth, ME 04097   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new 29’-4” x 29’-4” booster pump station constructed of CMU and brick veneer walls, standing seam metal roof, equipped with two vertical multistage pumps, VFDs, electrical, lighting, heat pumps, propane tanks and interior LP gas emergency standby generator. The site work includes clearing, grubbing, grading, gravel access driveway, chain link fence, swing gate, site piping, and underground electrical service.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents