Similar Projects
Last Updated | 03/20/2023 01:34 PM |
Project Title | Amerson Water Treatment Plant Reservoir Pump VFD Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Macon, GA 31211 (Bibb County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $260,687 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of furnishing and installing a complete once-through, 3-stage, pre-piped, wired, tested and packaged wet emergency chlorine gas scrubber system including an integral absorber with three chemical scrubbing stages, a mist eliminator, exhaust fan, integral caustic storage tank, caustic recirculation pump, piping, valves, fittings, ductwork, and all other equipment and accessories as specified to provide a total system. Removal of the existing wet chlorine gas scrubber system being replaced will be the responsibility of the Owner. The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the Contract Documents must be self-performed by the General Contractor. The Project will be awarded by base bid on a lump sum basis for the performance and completion of all Work required by the Contract Documents. Each Bid must be accompanied by a Bid Bond in the amount of 10% of the Bid, prepared on the form of Bid Bond that is part of the Contract Documents, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570. Bidders must comply with the Disadvantaged Business Enterprise Participation Requirements specified in the Instructions to Bidders. The Bidder shall affix to the outside of its Bid envelope the Bidders Georgia Utility Contractor License Number. A license number of a Utility Manager or a subcontractor is insufficient, and any Bid that fails to affix to the outside of its Bid envelope the Bidder's Georgia Utility Contractor License Number may be rejected. The successful Bidder for this Project shall be required to furnish a Performance Bond and Payment Bond, satisfactory to the Owner, each in the amount of 100 % of the Contract Price. Employment of Local Businesses and Contractors: It is the desire of the Owner that local businesses including disadvantaged, minority, and women enterprise subcontractors be given the opportunity to participate on the various parts of the Work. The Owners encouragement of participation of disadvantaged, minority, and women enterprises and of locally owned businesses and contractors is not intended to restrict or limit competitive bidding or to increase the cost of the Work. The Owner supports a healthy, free market system that seeks to include responsible local businesses and provide ample opportunities for local business growth and development. The Owner reserves the right to reject any or all Bids. The Owner reserves the right to waive informalities and technicalities. The Contract Documents include, but may not be limited to, the Instructions to Bidders, the Contract Agreement, the General Conditions, the Drawings, the Specifications (Divisions 01 through 46, inclusive, where applicable), and the forms of Bid Bond, Performance Bond, and Payment Bond. These and any other Contract Documents may be examined at the following location Engineering Department Macon Water Authority 537 Hemlock Street Macon, GA 31201 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |