Similar Projects
Road Surfacing and Realignment
Term Contract
Design
$250,000 to $500,000 est. value
MT

Threemile Pump Station Rehabilitation Project
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Fort Belknap Agency, MT 59526

Blackfeet Reservation Apartment Complex, Browning MT
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Browning, MT 59417

BI20-A49 Babb/ St. Mary’s Scattered Sites
Infrastructure
Bidding
$390,000 CJ est. value
Browning, MT 59417

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Hudson Bay Divide South
Infrastructure
Results

27th Street Water Main Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Fort Benton, MT 59442

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Post-Bid
MT

Grading, Gravel Surfacing, Plant Mix Surfacing, Bridge Replacement, Guardrail installation, Drainage, Signing and Pavement Markings
New Construction, Infrastructure
Results
MT

Construction of Park City School Water Supply
Infrastructure
Bidding
$3,000,000 CJ est. value
Park City, MT 59063

Routing and Crack Sealing Bainville East and West and Culbertson West Wolf Point Area
Infrastructure
Post-Bid
Bainville, MT

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Results
Poplar, MT 59255

Safety Improvements on the SF 179 Intersection Improvements
Infrastructure
Post-Bid

Last Updated 09/02/2022 10:04 AM
Project Title

Raw Water Intake, Pump Station, and Pipeline

Physical Address View project details and contacts
City, State (County) Fort Smith, MT 59035   (Big Horn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of, but is not necessarily limited to, the following major items: o Construction of raw water intake screens and piping in the Yellowtail Dam Afterbay. o Construction of concrete wet well, three vertical turbine pumps, and two sluice gates to isolate each intake pipe. o Construction of approximately 1,700 square foot CMU pump station building with piping, valves, meter, controls, chemical injection system, screen backwash system, electrical room, and associated appurtenances. o Construction of gravel access road, parking lot, site and drainage improvements and security fence around the pump station site. o Construction of backup generator and transformer located on concrete pads behind a CMU block wall on the site. o Construction of raw water pipeline and fiber optic conduit from the new pump station to the future water treatment plant site with control valves, combination air release valves, hydrants, and associated appurtenances. o Completion of horizontal directional drill under the Bighorn River and Bighorn Canal.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents