Similar Projects
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street
Bidding
Less than $8,142,405 est. value
Hialeah, FL 33010

Proposed 16-inch, 12-inch, and 8-inch DI Water Main and 10-inch and 8-inch DI Gravity Sewer
Bidding
$5,853,122 est. value
Miami, FL 33134

Weekly Septic Cleanout
Post-Bid
Homestead, FL 33030

Septic Services
Term Contract
Post-Bid
Miami, FL

Wastewater Collection System Repair
Results
Less than $500,000 est. value
North Miami Beach, FL 33162

City-Wide Rehabilitation of the Sanitary Sewer System
Results
$544,555 to $1,319,648 est. value
North Miami, FL 33161

Trenchless Pipe Installation and Pipe Rehabilitation Services
Post-Bid
FL

Grease Trap, Septic Tank and Storm Drainage Pump-Out and Repair Services
Term Contract
Results
Miami, FL

Maintenance of Stormwater and Sanitary Sewer Structures
Results
Less than $150,000 est. value
North Miami, FL 33161

Sanitary Sewer Cleaning and CCTV
Results
Less than $110,000 est. value
Miami, FL 33155

Maintenance, Repair and Install of Plumbing Systems and Lift Stations-Along Florida's Turnpike System
Results

Repairs to Sewer Laterals with T-Liner
Results
Bay Harbor Islands, FL 33154

Oleta River State Park - Sewer Connections
Results
North Miami Beach, FL 33160

60-Inch Force Main (NL-1A) between the Intersections of NE 151 Street and Biscayne Boulevard and NE 163 Street and NE 8 Avenue
Results
Less than $23,960,532 est. value
North Miami Beach, FL 33162

2020 General Utility Repairs
Results
Medley, FL 33166

Last Updated 03/04/2021 08:43 AM
Project Title

Water and Wastewater Services to Commercial Properties Green Tech Corridor-S-8 - Gravity Basin 30-0073

Physical Address View project details and contacts
City, State (County) FL   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,514,206
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of furnishing and installing approximately 3,485 linear feet of 8-inch PVC 900 of gravity sanitary sewer pipe; 90 laterals with cleanout; 16 reinforced concrete manholes; 9,786 linear feet of 12-inch zinc-coated ductile iron water main piping and fittings; 26 linear feet of 8-inch zinc-coated ductile iron pipe and fittings; 163 linear feet of 6-inch zinc-coated ductile iron pipe and fittings; 20 linear feet of 4-inch zinc-coated ductile iron pipe and fittings; resilient seated gate valves; fire hydrant assemblies with guard posts; removal of three (3) existing fire hydrants; furnishing and installing water services; making fourteen (14) tapping connections including installing tapping sleeves and valves; making six (6) solid connections to existing water mains including solid sleeves; removing 226 linear feet of existing gravity; removing two (2) existing sanitary sewer manholes; removing three (3) existing plugs and connecting to existing water mains including furnishing all fittings necessary for connections; furnishing and constructing flushing valve outlets; furnishing and constructing air release valve assemblies; polyethylene encasement for ductile iron pipe and fittings, if ordered by the Engineer; sheeting and shoring ordered left in place by the Engineer; additional suitable backfill, if needed; furnish all materials, equipment and supplies necessary for cleaning, testing and disinfecting the mains; removal of existing asphalt pavement and sod; removal, transport and legal disposal of demolition material including unsuitable material; placing existing water mains out of service upon completion of work; replacement of traffic loop detection assemblies; traffic control; temporary and permanent replacement of any sidewalk, sod, pavement markings, pavement and/or driveway damaged by construction and all other appurtenant and miscellaneous items and work for a complete and fully functional installation. Due to maintenance of traffic requirements in the FDOT roadway, night work is expected to be required by FDOT for lane closures. Regarding the need to reestablish the survey corridor prior to mobilization as indicated in the construction plans, the Contractor shall obtain the approval of survey baseline by Surveyor and the Engineer to ensure that the proposed improvements are installed within the public right-of-way per MDWASD standards to avoid encroaching into public property. Small Business Enterprise - Construction goal is 16.79%, Small Business Enterprise - Goods and Services goal is 6.12% which is based on the construction estimate plus the 10% Contingency Allowance. All subcontractors must be certified SBE-CON firms. Bidders can confirm a SBE-CON certification via BMWS at http://mdcsbd.gob2g.com/

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents