Similar Projects
Replacement of Fire Station 10 - Gate City Boulevard - 89 - City of Greensboro
New Construction, Infrastructure
Conception
$9,450,000 CJ est. value
Greensboro, NC 27407

Recreation Senior Center - City of High Point
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
High Point, NC 27260

The Resurgent Mixed-Use Development
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Greensboro, NC 27401

Smith Farm Apartments
New Construction, Infrastructure
Design
$109,000,000 CJ est. value
Greensboro, NC 27410

Streets Resurfacing
Infrastructure
Bidding
$4,605,945 CJ est. value
High Point, NC 27260

RFQ Construction Manager at Risk - Airfield Equipment Storage Building
New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
Greensboro, NC 27409

RFP - 2020 Townsend Water Treatment Plant - Electrical Improvements Phase II Project
Renovation
Sub-Bidding
$35,000,000 CJ est. value
Browns Summit, NC 27214

Westside WWTP Sludge Dewatering Equipment
Alteration
Post-Bid
High Point, NC

Starbucks / Whitsett - Rebid
New Construction, Infrastructure - 2,485 SF
Post-Bid
$1,200,000 CJ est. value
Whitsett, NC 27377

Hertz Facility Demolition and Line of Sight Grading Project
Demolition, Infrastructure
Results
$9,267,036 est. value
Greensboro, NC

Sandy Ridge Road Water Line Improvements
Infrastructure
Results
$973,705 CJ est. value
Greensboro, NC 27235

Syngenta Crop Protection Headquarters Redevelopment
New Construction, Renovation, Infrastructure - 221,000 SF
Construction
$68,000,000 CJ est. value
Greensboro, NC 27409

Professional Trailer Repair
New Construction, Infrastructure - 20,440 SF
Construction
$850,000 CJ est. value
Colfax, NC 27235

Carroll South
New Construction, Infrastructure - 30,000 SF
Pending Verification
$140,000,000 CJ est. value
Greensboro, NC 27401

Wolfetrail Road Multi Residential
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Greensboro, NC 27406

Last Updated 02/06/2023 03:08 PM
Project Title

5 Primary Clarifiers at the Eastside Waste Water Treatment Plant (WWTP) Are in Poor Condition

Physical Address View project details and contacts
City, State (County) Jamestown, NC 27282   (Guilford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The existing bridges for the 5 primary clarifiers at the Eastside WWTP are in poor condition. The work consists of full-blast surface preparation and coating application on the #1, #2, #3, #4, and #5 clarifier bridges and interior steel. All miscellaneous work related to the above. Quantities and major work items are more thoroughly described herein.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents