Similar Projects
Rodgers Elementary School - 2022 Bond - Lake Shore Public Schools
Addition, Renovation, Infrastructure
Design
$12,450,000 CJ est. value
St Clr Shores, MI 48081

Violet Elementary School - 2022 Bond - Lake Shore Public Schools - 5854917
Addition, Renovation, Infrastructure
Design
$6,300,000 CJ est. value
St Clair Shrs, MI 48082

Utica Community Schools - Eppler Classroom HVAC Upgrades
Renovation
Sub-Bidding
$250,000 CJ est. value
Utica, MI 48317

Michigan Math and Science Academy
Renovation - 59,680 SF
Post-Bid
Warren, MI 48092

Michigan Math and Science Academy
Renovation - 59,680 SF
Post-Bid
Warren, MI 48092

Center Line High School Renovation BP21-2
Renovation
Results
Center Line, MI 48015

Mount Clemens High School Elevator Renovation
Renovation
Results
Mount Clemens, MI 48043

Ardmore Elementary School Roofs and Boilers - 2019 Bond - Lakeview Public Schools
Renovation
Pending Verification
$433,716 CJ est. value
St Clr Shores, MI 48081

Ardmore Elementary School Facility Infrastructure Needs - 2019 Bond - Lakeview Public Schools
Renovation
Pending Verification
$959,917 CJ est. value
St Clr Shores, MI 48081

Masonic Heights Elementary School - 2022 Bond - Lake Shore Public Schools
Addition, Renovation, Infrastructure
Design
$5,700,000 CJ est. value
St Clair Shrs, MI 48082

Kitchen Renovations at Mcglinnen Elementary School Parker Elementary School Rainbow Elementary School
Renovation
Post-Bid
Clinton Township, MI 48035

District Wide BMS Front End Upgrade
Addition
Results
Fraser, MI 48026

Ardmore Elementary School Safety & Security Upgrades - 2019 Bond - Lakeview Public Schools
Renovation
Pending Verification
$291,938 CJ est. value
St Clr Shores, MI 48081

Kennedy Middle School Elementary School - 2022 Bond - Lake Shore Public Schools
Addition, Renovation, Infrastructure
Design
$10,870,000 CJ est. value
St Clair Shrs, MI 48082

Collins Elementary Renovations
Renovation
Post-Bid
Sterling Heights, MI 48312

Last Updated 01/12/2023 12:04 AM
Project Title

Lake Shore Public Schools District Wide Renovations Bid Package #001

Physical Address View project details and contacts
City, State (County) St Clr Shores, MI 48081   (Macomb County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,401,193 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

District Wide Renovations - BP 1 Please email evan.chechack@bartonmalow.com with any questions or PreBid RFIs Locations- Lake Shore High School - 22980 13 Mile Rd, St Clair Shores, MI 48082 Kennedy Elementary School - 23101 Masonic St Clair Shores, MI 48082 Masonic Heights Elementary School - 22100 Masonic, St Clair Shores, MI 48082, Violet Elementary School - 22020 Violet St, St Clair Shores, MI 48082 BID #1: LAKE SHORE HIGH SCHOOL 1. Remove floor tile and mastic (and associated covebase) approximately 5,240 sq. ft. Remove floor tile and non-ACM mastic (and associated covebase) approximately 375 sq. ft Kennedy Middle School PHASE 1 1. Remove three doors (and associated hardware) from Room 122, Room 123 and Room 124. Masonic Heights Elementary School PHASE 1 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 3,435 sq. ft. PHASE 2 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 1,580 sq. ft. from Room 13 and Room 16. PHASE 3 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 3,435 sq. ft. PHASE 4 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 1,580 sq. ft. from Room 14 and Room 15. PHASE 5 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 5,530 sq. ft. PHASE 6 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 100 sq. ft. from the Office in Room 101. BID #3: VIOLET ELEMENTARY SCHOOL Abatement Activities This section defines the asbestos abatement activities the awarded Contractor will perform at Violet Elementary School. PHASE 1 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 3,160 sq. ft. PHASE 2 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 3,160 sq. ft. PHASE 3 1. Remove floor tile and non-ACM mastic (and associated covebase) approximately 3,160 sq. ft. PHASE 4 1. Remove three doors (and associated hardware) from Room 15, Room 23 and Room 24. Bid Results: MASONRY Arisco Contracting $381,000 STRUCTURAL STEEL Lapeer Steel $47,887 CARPENTRY BJ Construction $999,000 MetalWall Panels SilverlineContracting $89,700 ROOFING Schena Roofing $189,436 ALIMINUM ENTRENCES Hewett Companies $205,000 FLOORING DF Floor Covering $1,526,350 PAINTING Continental Contracting $431,700 CASEWORK FCIGroup $264,000 MECHANICAL Advantage Mechanical $419,400 ELECTRICAL Sawyer Services $847,720

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents