Similar Projects
Architectural and Engineering Services- BIA
Infrastructure
Conception
Bangor, ME 04401

Eastside Center for Health and Rehabilitation Entrance
Addition, Infrastructure
Design
$500,000 CJ est. value
Bangor, ME 04401

Eastside Center for Health and Rehabilitation Entrance
Addition, Infrastructure
Design
$500,000 CJ est. value
Bangor, ME 04401

Bangor AFRC Road Repair Bangor Training Site
Infrastructure
Bidding
$250,000 CJ est. value
Bangor, ME 04401

Bangor AFRC Road Repair Bangor Training Site
Infrastructure
Bidding
$250,000 CJ est. value
Bangor, ME 04401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager - Llewellyn Estes Bridge #1 and #2 - Old Town - Region 4
Demolition, New Construction, Infrastructure
Post-Bid
$39,189,000 CJ est. value
Old Town, ME 04468

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course with Drainage and Safety Improvements
Results
Less than $4,403,000 est. value
Medway, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

The Rock Church of Greater Bangor Expansion
Addition, Infrastructure - 2,100 SF
Pending Verification
$3,000,000 CJ est. value
Bangor, ME 04401

Davis Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,130,432 CJ est. value
Bangor, ME 04401

Hammond Street Mixed Use Development
New Construction, Infrastructure - 12,000 SF
Design
$1,000,000 CJ est. value
Bangor, ME 04401

UM New Milking Facility
New Construction, Infrastructure - 10,560 SF
Bidding
$2,300,000 CJ est. value
Orono, ME 04473

Last Updated 09/11/2023 06:35 PM
Project Title

Essex Woods Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Bangor, ME 04401   (Penobscot County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $191,100 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bangor invites sealed proposals from qualified contractors to pave the existing Essex Woods/Dog Park parking lot. Work will also include removing the existing surface, re-grading the lot and the installation of 244 linear feet of 12" HDPE storm drain, 102 linear feet of 15" HDPE storm drain, and installing three (3) new catch basins. All questions must be directed in writing to bids@bangormaine.gov no later than 4:30 P.M. on August 11, 2023. The City will issue addenda no later than 4:30 P.M. on August 16, 2023 in response to any questions or inquiries raised at the pre-bid meeting or submitted in writing.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents