Similar Projects
Mustang Creek Assisted Living
New Construction
Conception
Flower Mound, TX 75028

Watermere at Flower Mound Senior Living
New Construction
Design
Flower Mound, TX 75028

Hall Park Redevelopment
New Construction
Design
Frisco, TX 75034

The Heritage at Creek Valley Senior Living
New Construction - 132,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Carrollton, TX 75010

The Heritage at Creek Valley Senior Living
New Construction - 132,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Carrollton, TX 75010

Cambridge Nursing and Rehabilitation Center
Addition - 20,295 SF
Post-Bid
$3,200,000 est. value
Richmond, TX 77469

Texas State Veterans Home
New Construction - 100,100 SF
Post-Bid
$23,000,000 est. value
Fort Worth, TX 76119

General Construction at CCSSLC Group Homes
Results
Less than $50,000 est. value
Corpus Christi, TX 78405

General Construction Svcs at CCSSLC
Results
Less than $50,000 est. value
Austin, TX 78756

Grand Living at Georgetown
New Construction - 210,612 SF
Construction
Georgetown, TX 78628

NEM Senior Living Center
New Construction - 160,000 SF
Construction
$22,000,000 est. value
Flower Mound, TX 75028

My Possibilities Campus
New Construction
Design
Garland, TX 75043

CSRP La Porte Senior Living
New Construction
Sub-Bidding
$30,000,000 est. value
La Porte, TX 77571

Heritage Place of Boerne
Renovation
Post-Bid
Boerne, TX 78006

Bond Home Repairs at Corpus Christi State Supported Living Center
Results
Less than $385,000 est. value
Corpus Christi, TX 78410

Reported 07/06/2021 01:20 PM
Project Title

Lexington Village Assisted Living Facility

Physical Address View project details and contacts
City, State (County) Missouri City, TX 77489   (Fort Bend County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method Bids by Invitation.
Project Status Obtained from a credible source, Awaiting verification, Construction Start Expected first quarter 2022
Bids Due View project details and contacts
Estimated Value $12,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Assisted Living Facility, 78,157 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents