Similar Projects
Valve and Finished Water Tank and Reservoir Improvements
Renovation, Infrastructure
Bidding
$2,000,000 est. value
Ann Arbor, MI 48103

North Star/Summit Street Water Storage Coating System Application
Infrastructure
Bidding
$200,000 est. value
Brighton, MI 48116

Underground Storage Tank Assessment and Recommendation Services
Infrastructure
Post-Bid
Detroit, MI

Underground Storage Tank System Removal
Infrastructure
Post-Bid
Farmington, MI 48336

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Calcium Chloride Tanks - St Ignace Garage, L'Anse Garage
Infrastructure
Post-Bid
MI

2021 Rehab of Brigden Tanks
Results
Battle Creek, MI

Replace Underground Water Tank - Sleeper State Park
Infrastructure
Post-Bid
Caseville, MI 48725

150,000 Gallon Water Tank and Scada Improvements, Contract B
Results
Vermontville, MI

Storage Tank Inspection and Maintenance Services
Term Contract
Post-Bid
Clinton Township, Inkster, Troy, MI 48035

South Water Tower
Results
$232,000 est. value
Mason, MI 48854

Repairs and Painting of the 250,000 Gallon Elevated Water Storage Tank
Infrastructure
Post-Bid
$180,000 est. value
Richland, MI

Contract 1 - Water Tower Improvements
Results
McBain, MI

Meridian Township Water Tower Contract 2022
Infrastructure
Post-Bid
$180,000 est. value
Okemos, MI

Last Updated 06/15/2022 11:52 PM
Project Title

Sodium Hypochlorite Storage Tank Replacement

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48103   (Washtenaw County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Request for Proposal (RFP) is to select a Contractor to procure and remove and replace two sodium hypochlorite bulk storage tanks and related piping, valves, electrical and instrumentation equipment within the existing containment area east of the Chemical Feed Building at the Ann Arbor Water Treatment Plant.

Details

Division 02 - Existing Conditions, Maintenance of Existing Conditions, Maintenance of Underground Storage Tank Removal.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents