Similar Projects
Curb Sections
Post-Bid
White Plains, NY 10601

Sidewalk Improvements Program
Post-Bid
Port Chester, NY 10573

Beekman Avenue Pedestrian Improvements - PIN Nos. 8761.15 and 8761.50
Results
Sleepy Hollow, NY 10591

Main Street Sidewalk Improvement
Results
Dobbs Ferry, NY 10522

Reconstruction of the Rye Town Park Beach Ramps
Post-Bid
Rye, NY 10580

Purdy`s Train Station Pedestrian Improvements
Results
Less than $581,000 est. value
North Salem, NY 10560

Central 5 Parking Lot ADA Asphalt
Post-Bid
Harrison, NY 10577

2020 Sidewalk and Curb Replacement
Results
Eastchester, Tuckahoe, NY

Babbitt Road Sidewalk Improvements
Post-Bid
Bedford Hills, NY 10507

Construction of Asphalt Driveway Aprons, Sidewalks, Curbs and Spoon Ditches
Term Contract
Results
Bedford Hills, NY 10507

Removal and Construction of Sidewalks, Concrete Curbs, etc.
Alteration
Post-Bid
Buchanan, NY

Sidewalk and Curb Improvements
Term Contract
Results
Pleasantville, NY 10570

Construction of Concrete Sidewalks
Alteration
Post-Bid
Bedford, NY

Old Tarrytown Road and Manhattan Avenue Sidewalk Improvements
Results
Greenburgh, NY 10607

2021 Sidewalk and Curb Replacement Project
Alteration
Post-Bid
Eastchester, NY

Last Updated 12/17/2021 06:03 AM
Project Title

Ramp Reconstruction I-287 EB to Saw-Mill River Parkway

Physical Address View project details and contacts
City, State (County) NY   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In Order To Address The Deficiencies Of The Mechanically Stabilized Earth System (Mses) Wall Ramp, This Project Will Replace The Existing Ramp, Minimizing Required Retaining Wall Systems And Eliminating The Use Of Mse Construction Methods By Incorporating Horizontal Realignment, New Embankment Sections, And The Appropriate Types Of Retaining Walls Where Needed. In Addition To The Proposed Retaining Walls That Will Reinforce The Existing Mse Walls That Support The Ramp, An Additional Wall Will Be Constructed In Front Of The Existing Bridge Abutment And Will Connect The Proposed Walls On Both Sides Of The New Ramp. The New Retaining Walls At The Beginning Of The Proposed Full Depth Reconstruction Would Reinforce The Existing Bridge Abutment At The End Of Bin 1070490 And The Existing Mse Walls That Are To Be Left In Place. This Will Reduce Traffic Impacts During Construction, Eliminate Significant Excavation And Fill Costs, And Save Time During Construction. This Project Is Located In The Town Of Greenburgh In Westchester County.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents