Similar Projects
Beach Erosion Control and Hurricane Protection Project Miami Beach Renourishment 2021 Miami-Dade County, Florida
Design
$30,000,000 to $50,000,000 est. value
Miami, FL

Saga Bay 1.7 Sub-Basin Water Quality Improvement Project
Bidding
Cutler Bay, Miami, FL 33189

SW 61st Ave Drainage and Roadway Improvements from SW 74 to 76 St
Infrastructure
Bidding
South Miami, FL 33155

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

South Miami-Dade Salt Intrusion Barrier Project
Post-Bid
Less than $500,000 est. value
Miami, FL 33128

Drainage Improvements Multiple Sites
Results
Less than $546,081 est. value
Miami, FL

Drainage Improvements C-100 Canal Outfalls Retrofit Between SW 98 Ave. and SW 106 Ct.
Results
Less than $693,814 est. value
Miami, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value

Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Post-Bid
$10,000,000 to $20,000,000 est. value
Miami, FL

Deep Well Cleaning and Drainage System Maintenance and Repairs
Results
Less than $210,000 est. value

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Post-Bid
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Drainage Improvements/ Sidewalk/Milling and Resurfacing
Results
Less than $1,680,739 est. value
FL

Florida City Canal Outfall and Equalizer Improvements Project
Post-Bid
Less than $989,000 est. value
Miami, FL 33128

Drainage Improvements Multiple Sites
Results
Less than $840,458 est. value
Miami, FL 33128

Arcola Lakes - Bioretention Area
Post-Bid
Less than $98,000 est. value
Miami, FL 33147

Reported 06/10/2021 12:00 AM
Project Title

Emergency Response for Storm Drain Cleaning

Physical Address View project details and contacts
City, State (County) FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,114,372
Plans Available from Agency's Affiliate - 05/06/21
Owner View project details and contacts
Architect View project details and contacts
Description

A. Work under this contract includes, but is not limited to the following: Furnishing all supervision, labor, required materials, equipment, tools and performing all operations necessary to completely remove and dispose of debris, vegetation, soil, rock, and any type of blockage inside existing pipe culvert(s), box culvert(s) or inlet structure(s) located with County maintained rights-of-ways pursuant to Mayor’s, Governor’s, or President Declaration of Emergency (Declaration of Emergency). The Work may also include nighttime work as directed by the County. The County, at its discretion, may award more than one contract based on the proposals received and the impacts of events associated with the Declaration of Emergency. If more than one award is made, award will be based off lowest responsive bid then the next lowest responsive bid and so forth and activated in the same order based on the Contractors availability and ability to satisfy the needs of the County at the time contacted. Illustrative Work Tasks may involve the following: 1. Access to the pipe or box culvert may require temporary removal of fence, signs, guardrail, grates or manhole covers. 2. Clean existing pipe or box culverts by completely removing all of the debris, vegetation, soil, rock, and any type of blockage to restore the hydraulic conveyance design capacity of the pipe or box culvert. 3. Clean existing inlet structures by completely removing all of the debris, vegetation, soil, rock, and any type of blockage. 4. Perform clearing operations in a manner not to damage the pipe culverts, box culverts, and inlet structures or surrounding area. 5. Meet the requirements of Federal, State and local environmental standards and laws when performing all activities. 6. Identify and report to Engineer necessary repairs to the pipes or box culverts and structures exposed during the clearing operation. 7. Document by GPS location of items cleaned and/or desilted and take pictures before and after performing the work using GPS coordinates embedded on the picture.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents