Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

Pompey Pillar National Monument Rock Stabilization
Infrastructure
Bidding
$5,000,000 CJ est. value
Pompeys Pillar, MT 59064

Saint Charles Mission School Parking Lot Reconstruction Rebid
Infrastructure
Bidding
$570,000 CJ est. value
Billings, MT 59101

Snow Plowing on Local Streets
Term Contract
Post-Bid
$450,000 est. value
Billings, MT

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

Hudson Bay Divide South
Infrastructure
Results

Plant Mix Surfacing
Infrastructure
Results
MT

Shop World 3 Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Falcon Ridge 4 Plex
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Coca-Cola Bottling Companies New Facility / Billings
New Construction, Infrastructure
Design
$23,700,000 CJ est. value
Billings, MT 59101

Landfill Compost Facility, Schedule 1
New Construction, Infrastructure
Bidding
$2,600,000 CJ est. value
Billings, MT 59101

Last Updated 02/10/2023 04:35 PM
Project Title

Northwest Billings Connector and Marathon Loop - Inner Belt Loop Phase II (Build Grant #DTOS59-20-RA-BUILD) - Schedule I

Physical Address View project details and contacts
City, State (County) Billings, MT 59105   (Yellowstone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $13,983,760 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Custom BT SCHEDULE I - Riverside Contracting - $11,132,013 SCHEDULE II - Weave Construction - $2,851,747 INNER BELT LOOP PHASE II which consists of construction of approximately 5 miles of 2-lane arterial road improvements from the existing roundabout at the Zimmerman Trail/Highway 3 intersection to Alkali Creek Road. Improvements include a 10-foot-wide multi-use asphalt path, drainage piping, roadway signage, and striping. CONTRACTOR and any of the CONTRACTOR subcontractors bidding or doing work on this project will be required to be registered with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. All laborers and mechanics employed by CONTRACTOR or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of Yellowstone County and the state of Montana. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Each bid or proposal must be accompanied by a Certified Check, Cashier Check, or Bid Bond payable to the City of Billings, MT in an amount not less than ten percent (10%) of the total amount of the bid. If the bid submittal includes bids for both Schedules I and II, separate bid bonds will be required for each schedule. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Bids submitted via email shall have the bid bond scanned and included with the bid. Bids submitted via mail or hand delivered shall have any of the bid securities included. For further information concerning this project, please contact Travis Harris at the Office of the City Engineer, 2224 Montana Ave., Billings, MT 59101, by telephone at (406) 247-8656 or by email at harrist@billingsmt.gov. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER. The City of Billings is an Equal Opportunity Employer.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents