Similar Projects
Last Updated | 06/12/2023 06:32 PM |
Project Title | North Jail Security Grid Ceiling Replacement |
Physical Address | View project details and contacts |
City, State (County) | Greeley, CO 80631 (Weld County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $579,200 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000320148 Bid Intent Not Available Question Acceptance Deadline 06/02/2023 01:59 AM EDT Prebid Conference 05/25/2023 12:00 PM EDT Contact Information Carolyn Geisert 9704004223 cgeisert@weldgov.com Weld County is seeking lump sum bids for the removal and replacement of the security grid ceiling system in the showers and lavatories at the North Jail A, B, C, TM, and TF pods per the project documents, specifications, and this scope of work. North Jail: 2110 O Street, Greeley Colorado 80631 Weld County North Jail A, B, C, TM, and TF pods shower and lavatories security grid ceiling system is failing and is in need of replacement. The existing framework and panels have corroded and in some cases are not or cannot be properly secured. The scope will be for complete removal and replacement or the entire security grid system in these areas of the pods described above. 1. Contractor will be responsible for procuring and executing all scopes of work as outlined and specified in the projects contract documents that have been provided during this bid request per the attachments outlined above and this scope of work. This will include but not be limited to all labor, materials, and equipment to complete the total scope of work. It is the contractor's responsibility at the time of bid submission to ensure that all project specifications and requirements have been included per the project documents provided. Completion- September 22, 2023. Construction Finish December 22, 2023 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |