Similar Projects
Grading, Drainage, Paving, Signals, and Culvert
Infrastructure
Bidding
$2,000,000 CJ est. value
Goldsboro, NC 27534

Grading, Drainage, Paving, Signals, and Culvert
Infrastructure
Bidding
$2,000,000 CJ est. value
Goldsboro, NC 27534

Demolition and Asbestos Removal Services Related to the Hazard Mitigation Grant Program (HMGP) Acquisition and Demolition Project
Term Contract, Demolition, Infrastructure
Post-Bid
$30,000 CJ est. value
Goldsboro, NC 27530

Goldsboro Business Campus - Phase I
Infrastructure
Post-Bid
Goldsboro, NC

Pavement Rehabilitation
Infrastructure
Results
NC

AWOS Site Preparation and Installation
Infrastructure
Results
Mount Olive, NC

Fremont Elementary
New Construction, Infrastructure - 109,336 SF
Construction
$24,000,000 CJ est. value
Fremont, NC 27830

Fremont Elementary
New Construction, Infrastructure - 109,336 SF
Construction
$24,000,000 CJ est. value
Fremont, NC 27830

Magnolia Grove
New Construction, Infrastructure
Pending Verification
$119,000,000 CJ est. value
Goldsboro, NC 27530

Berkeley Boulevard Apartments
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Goldsboro, NC 27534

Center for Industrial Technology and Engineering
New Construction, Infrastructure - 40,000 SF
Post-Bid
$12,199,360 CJ est. value
Goldsboro, NC 27530

Thin Lift Asphalt Pavement Preservation
Infrastructure
Results
NC

Shelton
New Construction, Infrastructure
Pending Verification
$38,000,000 CJ est. value
Goldsboro, NC 27530

Grading, Retaining Wall, Drainage, Utilities, Signing, Paving and Pavement Marking on Wayne Memorial
Infrastructure
Post-Bid
$600,000 est. value
Goldsboro, NC 27531

Milling, Resurfacing and Shoulder Reconstruction
Infrastructure
Results
$4,000,000 est. value
NC

Last Updated 11/07/2022 06:04 AM
Project Title

Wayne County Replacement Jail

Physical Address View project details and contacts
City, State (County) Goldsboro, NC 27530   (Wayne County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Prison/Jail, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project: This Project, the Wayne County Replacement Jail, is generally comprised of, but not limited to, the following work: The project generally consists of a new detention center totaling approximately 109,500 SF. The project is mixed-construction consisting of both Type II-B and Type I-B construction, Group I-3 and Group B occupancy. Construction includes concrete and brick veneer masonry construction with steel framing, interior CMU partitions, TPO roofing, architectural casework, food service equipment, detention equipment, security electronics, and finishes typically associated with a new detention center. The Project includes a kitchen, laundry, vehicle sally port, intake/ booking and steel detention cells. Sitework includes stormwater management, sidewalks, parking lots, grading, and fencing/ gates. Mechanical work includes ductwork, plumbing, sprinkler system, smoke control system, controls, and roof top units. Electrical work includes panelboards, lighting fixtures, fire alarm, emergency generator, power, technology wiring and infrastructure; and security systems (cameras, intercoms, duress, door controls, and touchscreens). Construction is anticipated to begin by January 2023. Substantial Completion is anticipated to be no later than August 2024. Contractors shall be prequalified without regard to race, religion, color, sex, or national origin, or disability. The Owner and/or its representative(s) will objectively evaluate the information contained in the Application. The Architect (Moseley Architects) will be a representative of the Owner. If questions arise concerning the Prequalification Procedure or the Project, contact the Architect (Bryan Payne, AAIA) at bpayne@moseleyarchitects.com for information and clarifications. Applications, which are non-responsive, incomplete, misleading, incorrect, and/or illegible, may be rejected at the discretion of the Owner. Determination of the completeness of the application will be at the sole discretion of the Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents