Similar Projects
Huntsville Northern Bypass - City of Huntsville
Renovation
Conception
$30,000,000 CJ est. value
Huntsville, AL 35801

MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Roadway Improvements (Turn Lane Addition, Grading, Drainage, Pavement, Micro-Milling, Resurfacing, and Traffic Stripe) on SR-171 at Prewitt Loop Road
Infrastructure
Bidding
$1,334,302 CJ est. value
Northport, AL 35475

Constructing the Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass)
Infrastructure
Bidding
$92,231,294 CJ est. value
Linden, AL 36748

Constructing the Resurfacing on Hodgesville Road From the Junction of East Saunders Road
Post-Bid
$513,012 to $627,244 est. value
AL

BX Birmingham Xpress, Bus Rapid Transt (BRT) - Transit Stations
New Construction
Post-Bid
Birmingham, AL 35208

Bryce Campus Utilities and Infrastructure
Results
$1,200,000 to $1,400,000 est. value
Tuscaloosa, AL

Scottsboro Street Surfacing
Results
Scottsboro, AL 35768

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

Multi-Use Concrete Trail - Old Cahawba Archaeological Park
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Orrville, AL 36767

Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Intersection Realignment and Installation of Turn Lanes at CR-31 (Old Hwy 31) and SR-3 (US-31)
Infrastructure
Bidding
$2,000,000 CJ est. value
Bay Minette, AL 36507

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65
Infrastructure
Post-Bid
$6,612,039 CJ est. value
Athens, AL 35613

Last Updated 10/31/2022 09:36 AM
Project Title

Safety Widening, Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-15 (US-29)

Physical Address View project details and contacts
City, State (County) Valley, AL 36854   (Chambers County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $5,149,619 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Chambers Constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-15 (US-29) from 0.300 mile south of the junction of Judge Brown Road (MP 204.561) to 1.010 miles south of the I-85 Overpass in Valley. Length 4.316 mi. The Bracket Estimate on this project is from $3,845,947 to $4,700,602 . Contract Time: 120 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 027 - Safety Widening, Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-15 (US-29) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 99-304-690-000-901

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents