Similar Projects
HVAC Upgrades Building 753
Bidding
Denver, CO

Energy Management Controls System (EMCS) Technical Service Agreement
Bidding
Aurora, CO

Temperature Monitoring System
Post-Bid
Aurora, CO

General Mechanical / Hvac Construction and Preventative Maintenance Services
Post-Bid
Thornton, CO 80229

Air Traffic Control Chillers
Results
Aurora, CO 800119589

Lpsc Hvac Upgrade – Rtu Bid Package
Results
Less than $80,000 est. value
Westminster, CO

Districtwide Refrigeration Maintenance and Repair Services
Bidding
CO

Fire Station 2 and Fire Station 4 Condenser and Heater Replacement
Post-Bid
$45,000 to $55,000 est. value
Aurora, CO 80012.

HVAC Water Treatment
Results
Aurora, CO

Design/Build for Replacement of Computer Room Air Conditioners (CRAC)
Post-Bid
Aurora, CO 80016

CU Anschutz Repair Steam Condensate to Vault 2
Results
$100,000 est. value
Aurora, CO

Heating, Air Conditioning, Ventilation Maintenance and Repair Services
Term Contract
Post-Bid
Aurora, CO 80012

Dental School Improve Exhaust Fan EF-2 on Roof
Results
Less than $176,510 est. value
Aurora, CO 80045

Buckley AFB, CO - Comm Ducts to NOSC, B1301
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO 80012

2020 HVAC and Controls Maintenance
Results
Westminster, CO 80031

Last Updated 06/05/2020 03:32 PM
Project Title

Dental School 3rd and 4th Fix Cooling Issues

Physical Address View project details and contacts
City, State (County) Aurora, CO 80045   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $220,238
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The final settlement notice is required Work will consists of the following: install new Variable Air Volume (VAV) Boxes, installing new VAV boxes, replace low-pressure ductwork distribution, add slot diffusers, add perforated return grills into ceiling grid, re-balance new VAVs, reuse and reconnect thermostat to new VAV box, integrate into the building temperature control system, install new hydronic control valves, new hydronic piping distribution with insolation, install new Direct Digital Controller (DDC) hydronic temperature controls on floor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents