Similar Projects
Last Updated | 11/10/2022 09:01 PM |
Project Title | 10th & Front Garage Structural Concrete Repairs - Phase 2 Project |
Physical Address | View project details and contacts |
City, State (County) | Boise, ID 83702 (Ada County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Parking Garage |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $790,997 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Capital City Development Corporation invites licensed Public Works Contractors to submit bids for the 10th & Front Garage Structural Concrete Repairs - Phase 2 Project. 1. Concrete repairs to Owner's 10th & Front Parking Garage. The extent of the Work is shown in the Drawings and specified in the Project Manual. 2. The Work includes partial depth, strip repair of concrete slab over precast beams, Level 4, removal of scaling, deteriorating concrete, corroded reinforcing steel in slabs over the beams, and miscellaneous partial depth, full depth, and vertical/overhead concrete repairs. All repairs to be performed with high quality air entrained concrete and epoxy coated reinforcement. The work also includes column repairs, beam bearing repairs and removal and replacement of beam bearing pads at selective locations, Routing and sealing joints around the partial and full depth repairs is incidental to the work. a. General Mobilization/Demobilization and General Conditions: This work consists of all labor, materials, tools and equipment required for setting-up, storage/staging areas and facilities required by State Laws and Authorities Having Jurisdiction; and the general mobilization of equipment required for the completion of the work shown on the Contract Documents. The cost of this item shall include all permits and fees required to perform the project, including licenses and bonds, unless otherwise noted in the Contract Documents, and all expenses for the de-mobilization to a 'broom clean or better' condition after the work has been completed. If a building permit is required, it will be the contractor's responsibility to get the necessary permit to perform the repair work, unless noted otherwise in the documents. This work shall also include the following items: 1) Reviewing existing electrical plans, if available, and existing conditions for each phase of the work to identify the likelihood of embedded conduits/wiring in the floor slabs. All existing mechanical and electrical services shall be maintained/restored by the Contractor for all work areas. 2) Provide effective ventilation system to safely remove all dust and hazardous fumes generated from the concrete demolition and any surface treatment applications. 3) Protection of overhead fire protection system to be maintained inplace, if any. 4) Protection of existing overhead mechanical and electrical systems, if any, to be maintained in-place. 5) Removal of loose overhead concrete from the structural concrete members in areas adjoining work locations within the structure prior to the start of any demolition work. A Public Works Contractors License issued by the State of Idaho is required to bid on this work. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |