Similar Projects
Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

Cherokee National Forest Road Maintenance IDIQ
Term Contract
Design
Del Rio, Tellico Plains, TN 37727

Cherokee National Forest Road Maintenance IDIQ
Term Contract
Design
Del Rio, Tellico Plains, TN 37727

Short Springs Road - Guardrail Installation
Infrastructure
Bidding
Tullahoma, TN 37388

RFQ Construction Management at Risk - Construction Management at Risk Services for Second Avenue Restoration
Infrastructure
Bidding
$110,000 CJ est. value
Nashville, TN 37201

Painting of Mast Arms
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Collierville, TN 38017

2021 Contracted Paving Area 31
Post-Bid
Kingsport, TN

Bridge Replacement on Camp Austin Road
Post-Bid
Wartburg, TN

St. Elmo Riverwalk 4 Extension
Results
Chattanooga, TN 37409

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

Northside High School Redevelopment
New Construction, Infrastructure - 270,000 SF
Pending Verification
$71,900,000 CJ est. value
Memphis, TN 38107

Safe Cozy Village
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Memphis, TN 38111

RFQ Engineering - Annexation Area Water Main Phase II
Infrastructure
Conception
$700,000 CJ est. value
Germantown, TN 38138

Last Updated 07/28/2022 09:38 AM
Project Title

Trail Pedestrian Bridge

Physical Address View project details and contacts
City, State (County) Erwin, TN 37650   (Unicoi County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project has cancelled All parts, labor, equipment, supplies, and services as necessary to install a new pedestrian bridge on the Erwin Linear Trail. The bridge will go over dry land that is clear from debris, shrubbery, and vegetation. The pedestrian bridge will need to be 60' X 10' based on measurements. The bridge will connect up to paved (asphalt) surfaces on each end. Bridge will need to support the weight of a loaded backhoe. The contractor is responsible for furnishing the proper licenses, fees, and permits required by law to do business in the Town of Erwin. Contractor must be a licensed contractor in the State of Tennessee.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents