Similar Projects
Last Updated | 08/09/2022 11:59 PM |
Project Title | Construction At Dodge County Airport - Jet-A and Avgas Fuel Systems |
Physical Address | View project details and contacts |
City, State (County) | Juneau, WI 53039 (Dodge County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,372,623 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of August 09,2022, this project has not yet been awarded. A timeline for award has not yet been established.** Replace Jet-A and AvGas Fuel Systems Base Bid: Replace Jet-A and AvGas Fuel Systems, Aggregate Base Dense: 1,050 TON; HMA Asphalt: 390 TON; Concrete Pavement: 175 SY; Fencing: 225 LF; Vehicle Gate: 1 EACH; Electrical Trenching: 525 LF; Electrical Power Equipment: 2 LS; Area Lighting: 1 LS DBE Goal: None Assigned Contract Completion Time: 60 Calendar Days There are two options for bidders to submit bids: A cost of $35 per project, or a monthly subscription wherein the bidder is able to submit bids for all projects in bidexpress.com system for $50 per month. Subscriptions can be turned on and off at any time by the registered user. Only the prime or general contractor submitting a bid are responsible for payment. A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, bank's draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. The electronic template will allow the following options for meeting the proposal guaranty. E-Verify bid bond (Surety2000 & SurePath), uploading a copy of the bid bond or certificate of annual bid bond, certified check, bank draft, or money order. Any bid security, other than a E-verified bond or certificate of annual bid bond is provided, the department will require that the apparent two lowest bidders to mail or hand-deliver the original bond, certified check, bank draft, or money order to the Bureau of Aeronautics by close of business two business days following the close of bids and must be received by the Bureau of Aeronautics no later than 5 days from the posting of the bid results. For further information, contact Jeremy Roberts, P.E. at (920) 931-0581, email jroberts@msa-ps.com Scope of Work. The Work under this Contract consists of the replacement of Jet-A and 100-LL fuel systems, and all incidental items necessary to complete the Work as shown on the Plans and included in the Proposal and Contract. A. These Special Provisions and Technical Specifications will identify the equipment performance to be met by the Contractors. B. Due to the specific nature of how various equipment components are put together to make up a functioning aircraft fueling system, known manufactures and suppliers of acceptable equipment will be identified. C. "Or approved equal" equipment is acceptable if, in fact, it is equal in performance, materials, code compliance, and serviceability as determined by the Engineer. D. Equipment components to have shop drawings/submittals reviewed by the Engineer include, but are not limited to, the following items: 1. Underground Tank(s) 2. Tank Anchoring System and Buoyancy Calculations 3. Overfill Prevention Valves 4. Fueling Cabinets 5. Tank Monitor 6. Tank Level Probe(s) 7. Interstitial Probe(s) 8. Floating Suction Assembly 9. Piping & Supports 10. Fuel Hoses 11. Fueling Nozzle(s) 12. Hose Reels Description of work: Replace Jet-A and AvGas Fuel Systems. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |