Similar Projects
Library Bond Projects
Renovation
Conception
$778,000 est. value
Monroe, NC

New Pender County Library
New Construction - 14,000 SF
Conception
$7,000,000 est. value
Burgaw, NC

Grace Library & Museum Building
New Construction - 85,000 SF
Design
Wilmington, NC 28401

Chavis Branch Library/Windsor Recreation Joint Facility - 492 - City of Greensboro
New Construction, Infrastructure
Design
$68,000,000 CJ est. value
Greensboro, NC 27401

Move Planning Services, Louis Round Wilson Library Infrastructure Upgrades UNC Chapel Hill
Renovation - 317,529 SF
Bidding
$31,185,830 CJ est. value
Chapel Hill, NC 27514

Project Grace
New Construction, Infrastructure - 85,000 SF
Sub-Bidding
$50,000,000 CJ est. value
Wilmington, NC 28401

Randall Library Expansion and Renovation Package C - Security
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$180,000 CJ est. value
Wilmington, NC 28403

CM at Risk for a New Southwest Regional Library and Associated Improvements
New Construction
Post-Bid
NC

Stanford L. Warren Library Building Improvements
Renovation
Post-Bid
Durham, NC 27707

ASU - Belk Library and Information Commons Lower Level Maker Space Renovation
Renovation - 2,400 SF
Results
Boone, NC 28607

Nantahala Community Center and Library Renovations - Fire and Security
Renovation
Results
$13,550 CJ est. value
Topton, NC 28781

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

The 203 Project / Carrboro - BP500 Prequalification
New Construction, Infrastructure
Construction
$26,071,297 CJ est. value
Carrboro, NC 27510

Morrisville Town Center Core - Phase 1
New Construction
Pending Verification
Morrisville, NC 27560

Lilly Library Expansion and Renovation
Addition, Demolition, Renovation
Pending Verification
$47,000,000 CJ est. value
Durham, NC 27705

Last Updated 06/14/2023 06:33 PM
Project Title

Louis Round Wilson Library Infrastructure Upgrades

Physical Address View project details and contacts
City, State (County) Chapel Hill, NC 27514   (Orange County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids
Project Status Construction start expected June 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $31,185,830 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 6, 2023, an architect has been awarded and this project is in the design phase. A contractor bidding timeline has not yet been disclosed. A construction timeline has not yet been confirmed, but is anticipated to begin late 2023, early 2025. *The closed solicitation has been included below for reference: This project scope of work includes the design of infrastructure upgrades to the Louis Round Wilson Special Collections Library (Wilson Library). Wilson Library is a 317,529 GSF building originally constructed in 1929, with subsequent additions constructed in 1953 and 1977. The infrastructure upgrades are to involve code compliant vertical circulation, accessibility modifications and the installation of new mechanical and fire protection systems within 1953 and 1977 portions of the facility. There will be an initial Advanced Planning design phase in compliance with the State of North Carolina Performance Standards for Sustainable, Energy Efficient Buildings. In addition, the Advanced Planning design phase will examine long term conceptual planning for the Library at a high level to ensure that appropriate strategies are being pursued as part of the infrastructure upgrades project. The goal being to not hinder future programming or potential re-configurations. The University will then contract with the design firm for the defined scope of work to provide: Schematic Design, Design Development, and Construction Documentation, including Life-cycle Cost Analysis at each design phase; Construction Cost Estimation; Phasing Plans (as may be necessary); and Construction Administration services. Design Services shall include: Architecture, Structural, Mechanical, Electrical, Plumbing, Fire Protection, and Abatement Design. Library planning experience via the team lead or direct consultant is also preferred. The method of contractor selection has not been determined at this time.

Details

317,529 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents