Similar Projects
Take 5 / Fredericksburg
New Construction, Infrastructure - 1,432 SF
Conception
$350,000 CJ est. value
Fredericksburg, VA 22401

NEON Mixed-Use Development
New Construction, Infrastructure - 50,000 SF
Design
$153,000,000 CJ est. value
Fredericksburg, VA 22401

New Middle School - Fredericksburg City Public Schools
New Construction, Infrastructure - 140,000 SF
Design
$57,000,000 CJ est. value
Fredericksburg, VA 22401

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Bidding
$10,000,000 CJ est. value
Bassett, VA 24055

SGR - 2023 Plant Mix - Primary
Infrastructure
Bidding
$1,500,000 CJ est. value
Fredericksburg, VA 22401

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Snowden Pump Station and Force Main Improvements
Renovation
Results
Fredericksburg, VA 22401

Porchlight Commons
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fredericksburg, VA 22408

Corrective Maintenance and Repairs for Water, Sewer and Storm Water Systems
Term Contract
Post-Bid
$100,000 est. value
Dahlgren, Fredericksburg, Stafford, VA

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Idlewild Site Preservation Plan
Renovation, Alteration
Post-Bid
Fredericksburg, VA

Fredericksburg Readiness Center Modernization
Addition, Demolition, Renovation, Infrastructure - 2,982 SF
Results
$773,952 CJ est. value
Fredericksburg, VA 22401

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Last Updated 01/17/2023 10:39 AM
Project Title

LFR-15 - Replace 18", 15" and 12" with 24" Line along Claiborne Run from Morton Road to Kings Hill Road - County of Stafford

Physical Address View project details and contacts
City, State (County) Fredericksburg, VA 22401   (Fredericksburg City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2025
Bids Due View project details and contacts
Estimated Value $3,612,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project (LFR-15) includes replacement of existing 12 inch, 15 inch, and 18 inch gravity sewers with a 24 inch gravity sewer. Location: The project will be constructed along Claiborne Run, near Morton Road to Kings Hill Road. As of January 17, 2023, this project is currently in the FY 2022-2031 CIP. Design stage FY24, Construction FY25-26 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents