Similar Projects
Roof Replacement at Miller Intermediate
Post-Bid
Houston, TX

Roof Repair CREW
Term Contract
Post-Bid
Houston, TX

UHV Jaguar Hall Roof Replacement
Results
Houston, TX

UCT Data Center Roof Replacement
Results
Houston, TX

Roofing Repairs and Replacement Services
Post-Bid
Houston, TX 77000

Harmony Public Schools - Roof Refurbishments Project
Results
Houston, TX

City Hall Roof Replacement
Post-Bid
Less than $800,000 est. value
Houston, TX 77002

2019 Roof Replacement Package
Results
Webster, TX 77598

National Roofing Program (NRP) Design/Build 63rd
Post-Bid

HPD Northeast Police Station - HVAC and Roof Replacement
Results
$800,000 est. value
Houston, Sheldon, TX 77028

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Fire Station 39 Roof Repairs
Results
Houston, TX

Lutheran Plaza Deck Re-Roofing
Post-Bid
Houston, TX

South Campus S-8 Roof Replacement
Results
Less than $1,630,062 est. value
Houston, TX 77089

Field Service Center Roof Replacement
Post-Bid
Houston, TX 77029

Last Updated 04/04/2019 09:45 AM
Project Title

Police Memorial Guard Shack Renovation Roof Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX 77007   (Harris County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Scope of Work: 1. Remove and dispose of the existing roofing system. 2. Inspect and repair the substrate (if required), per the unit cost described below. 3. Install fire rated wood blocking (2x6) at the perimeter and rise -wall to be mechanically attached. 4. Install fire rated plywood (3/4-inch) at the rise-wall to be mechanically attached. 5. Clean, prime and install fiberglass base sheet (vapor barrier) to be set in hot asphalt. 6. Install iso insulation (two layers / total thickness: 4.0 -inch) to be set in hot asphalt. 7. Install iso insulation tapered system (1/4-inch per foot slope / 0.5-inch starting thickness) to be set in hot asphalt. 8. Install securock insulation (1/2-inch) to be set in hot asphalt. 9. Install perlite cant strip at vertical intersections to be set in hot asphalt. 10. Install three (3) plies of type four (4) felt to be set in hot asphalt. 11. Install code lead jackets. 12. Install prefinished aluminum (.032) metal gravel guard with mill finish aluminum (.040) cleat. 13. Install two (2) plies of type 4 felt at base flashing and strip -in to be set in hot asphalt. 14. Install modified bitumen (energy star) cap sheet to be set in adhesive. 15. Remove the roofing related refuse on a daily basis.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents