Similar Projects
Construction of Side Stream Storage for Fairhope Sewer Upgrade Phase I
Renovation, Alteration
Bidding
$800,000 est. value
Fairhope, AL

Mountain Fork Water Treatment Plant High Service Pump Improvements
Infrastructure
Bidding
$400,000 est. value
New Market, AL 35761

Well 39A Construction
Post-Bid
Montgomery, AL

Construction of the Drinking Water Test Well 8
Post-Bid
Dauphin Island, AL

2019 Water System Improvements - Contract B New Water Supply Well No. 3, Existing Well No. 2 Pump Rehabilitation
Results
Buhl, AL 35446

CR40 Tank and Booster Pump CE Project
Results
$292,450 est. value
AL

Pintlala Water System
Alteration
Construction
Hope Hull, AL

Heat Pumps
Infrastructure
Post-Bid
Winfield, AL

Purchase Four (4) Submersible Pumps
Results
Mobile, AL

Replace Water Supply Well - 1 (Contract C)
Infrastructure
Post-Bid
Axis, AL

Well Test Drilling - DWSRF
Results
Cordova, AL

Secondary Loop Pump Replacement Children's and Women's Hospital
Infrastructure
Post-Bid
Mobile, AL 36604

Well 2, Well 3, Well 4, BPS A and BPS B Upgrades
Results
Less than $2,000,000 est. value
Eufaula, AL

MOB Lavatory Waste Receiving Station Grinder Pump
Infrastructure
Post-Bid
Mobile, AL 36608

Electric Motor Repairs And Maintenance
Results
Huntsville, AL

Reported 07/14/2022 12:00 AM
Project Title

Well No. 5 Rehabilitation and Generator and Well No. 7 Generator

Physical Address View project details and contacts
City, State (County) Phenix City, AL   (Russell County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents