Similar Projects
Capital Improvements - Lincoln School Department
Renovation, Addition - 72,800 SF
Conception
$7,000,000 est. value
Lincoln, RI 02865

Hidden Meadows
New Construction
Design
Cumberland, RI

Community Music Works
New Construction, Infrastructure - 11,033 SF
Design
$5,000,000 CJ est. value
Providence, RI 02909

Reconstruction of Veterans Park Tennis Courts
Infrastructure
Bidding
$200,000 CJ est. value
Pawtucket, RI 02861

Summer St Apartments / Providence (Summer I and Summer II)
New Construction, Infrastructure - 143,893 SF
Bidding
$45,000,000 CJ est. value
Providence, RI 02903

Woonsocket School LED Lighting
Renovation
Sub-Bidding
$343,685 CJ est. value
Woonsocket, RI 02895

CSO Phase III A-9 GSI Projects
Infrastructure
Post-Bid
Central Falls, RI 02863

Construction Managers Elizabeth Baldwin Elementary School Replacement
Renovation
Post-Bid
Pawtucket, RI 02860

Site Improvements and Remediation Activities - Wooded Parcel at Tasca Field
Infrastructure
Results
Scituate, RI 02857

Design Builder for Windmill Elementary School at 110 Paul Street
New Construction
Results
$26,500,000 est. value
Providence, RI 02904

AF Rhode Island High School
Renovation - 75,000 SF
Construction
Providence, RI 02909

AF Iluminar
Addition - 22,000 SF
Construction
$400,000 est. value
Cranston, RI 02920

New Early Childhood Center
New Construction
Pending Verification
$28,600,000 est. value
Johnston, RI 02919

New Elementary School Construction
New Construction
Pending Verification
$84,350,000 est. value
Johnston, RI

Latimer Lane School
New Construction
Design
Cranston, RI 02920

Last Updated 08/02/2022 11:38 AM
Project Title

Community Elementary School Additions and Renovations

Physical Address View project details and contacts
City, State (County) Cumberland, RI 02864   (Providence County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2 2022 there is an awarded bidder on this project. The scope of work shall be as described in the drawings and in the project manual for the new one-story addition to the Community Elementary School. The addition will be approximately 9,541 square feet that will contain a new cafeteria with kitchen, a stage area and two classrooms that will be connected to the existing building. This addition shall include new finishes, HVAC, electrical, plumbing, a fire suppression system and sitework. All questions regarding this Request for Proposals may be directed to Megan Havrilla at Colliers Project Leaders, megan.havrilla@collierseng.com. PN - ENG22-0148

Details

1 Story Above Grade, 9,861 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents