Similar Projects
Davis Elementary School 2021 HVAC Replacement
Alteration
Bidding
Royse City, TX 75189

Haggard and Hendrick Middle Schools Cooling Tower Replacement
Post-Bid
Less than $300,000 est. value
Plano, TX 75025

Plano Event Center HVAC Replacement Project
Post-Bid
Plano, TX

HVAC Mechanical Repairs at the Allen Event Center
Results
$151,735 est. value
Allen, TX 75002

Thomas Elementary School Boiler Replacement
Results
$50,000 est. value
Plano, TX 75023

Frisco ISD - Summer 2021 - HVAC
Post-Bid
Less than $2,000,000 est. value
Frisco, TX

HVAC Filter Replacement
Term Contract
Results
Allen, TX 75013

HVAC and Mechanical Products
Term Contract
Post-Bid

City Hall Server Room HVAC Replacement
Results
Allen, TX 75013

Boiler Replacement at Plano Campus
Post-Bid
Plano, TX 75074

Stewart Creek West WWTP Automated Brush Cleaning System
Results
Wylie, TX

Operations Building at Main Lane Plaza 7 HVAC Upgrades
Post-Bid
$100,000 to $200,000 est. value
Plano, TX 75075

HVAC Replacement/Upgrade
Term Contract
Results
$276,476 est. value
Plano, TX 75093

HVAC Equipment Removal and Installation Only
Post-Bid
Anna, TX

Plano Senior Center VAV Replacement
Results
Less than $80,000 est. value
Plano, TX 75075

Reported 11/10/2021 12:00 AM
Project Title

MPE Systems Replacements and Upgrades at Jasper High School, Plano West Sr. High School, and Hightower Elementary

Physical Address View project details and contacts
City, State (County) Plano, TX 75024   (Collin County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 10/21/21
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Jasper HS: Remove and replace existing chilled water system components to include piping, valves, expansion tank, shot feeder, VFDs, insulation and accessories. Install new buffer tank, air separator and all related accessories. Remove glycol make-up system, all ice storage tanks and remove all glycol from the tanks and related piping in the plant only. Revise controls as and electrical required. Include all demolition and restoration work. Hightower ES: Remove and replace existing exhaust fans and heating water system components to include piping, valves, expansion tank, shot feeder, pumps VFDs, insulation, boilers, flues and accessories. Add new unit heater, buffer tank and air separator. Revise controls and electrical as required. Include all demolition and restoration work. Plano West SHS: Remove and replace existing condensing unit and cooling coil in an existing variable air volume air handling unit and outside air ductwork serving existing fan coil units. Install new outside air ductwork, air filter systems, motorized control dampers and Fire/Smoke dampers in the outside air ductwork systems. Include all related insulation, accessories, controls revisions and electrical power supply as required. Include all demolition and restoration work. Jasper High School - Estimated Budget- $195,000 Hightower Elementary School – Estimated Budget - $385,000 Plano West Senior High School – Estimated Budget - $118,000.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment, Humidity Control Equipment, Mechanical Dehumidification Units.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents