Similar Projects
Mace Road Sidewalks - City of Kansas City
Infrastructure
Conception
$260,000 est. value
Kansas City, MO 64152

Mace Road Sidewalks - City of Kansas City
Infrastructure
Conception
$260,000 est. value
Kansas City, MO 64152

Museum Tower / Kansas City
New Construction, Infrastructure - 293,400 SF
Design
Less than $116,200,000 est. value
Kansas City, MO 64111

Fire Station 4 Replacement - 75735874 - City Of Lees Summit
Demolition, New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Lees Summit, MO 64064

8th Street and Woodland Ave Streetscape - Rebid
Infrastructure
Bidding
$87,597 CJ est. value
Kansas City, MO 64106

8th Street and Woodland Ave Streetscape - Rebid
Infrastructure
Bidding
$87,597 CJ est. value
Kansas City, MO 64106

McBee's Coffee 'N Carwash / Lee's Summit
New Construction, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Lees Summit, MO 64082

Contact Basin Online pH Monitoring Project
Term Contract
Sub-Bidding
Independence, MO 64050

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Kansas City MoDOT Parking Lot Paving
Infrastructure
Post-Bid
Kansas City, Lees Summit, MO

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

East Side of Ward Parkway - W 83rd Street to W 84th Street
Results
Less than $110,995 est. value
Kansas City, MO 64114

Origin Kansas City Hotel
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Kansas City, MO 64120

I-670 Deck- City of Kansas City
New Construction, Infrastructure
Pending Verification
$160,000,000 CJ est. value
Kansas City, MO 64108

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 est. value
Kansas City, MO 64134

Last Updated 08/05/2022 03:03 PM
Project Title

Colbern Road Improvements From M350 Highway to Douglas Street - City of Lee's Summit

Physical Address View project details and contacts
City, State (County) Lees Summit, MO 64086   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $20,977,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project is included City of Lees Summit FY 2023-2027 The project will improve Colbern Road from M350 Highway to Douglas Street. The road will be widened to 4 lanes with turn lanes. Work required for this project includes traffic analysis and engineering, surveying, horizontal and vertical design, curb and gutter, enclosed storm drainage, sidewalk, shared-use path, water main installation, culvert extensions or replacements, bridge work for vehicular traffic and bicycle/pedestrian accommodations over the UPRR, intersection, roundabout and signal design, street lighting, environmental permitting, and utility relocation in accordance with established SUE quality levels. The project may also include water quality BMPs, sustainable design elements, and landscaping, if appropriate. The sidewalk and shared-use path will be extended beyond the project limits to connect with the existing sidewalk and shared-use path along Colbern Road. The work will be done in accordance with MODOT LPA Manual standards for STP projects receiving federal funding. As of August 5, 2022 this project is in design. Construction is estimated to occur in 2023-2024

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents