Similar Projects
Brewster-Douglas Housing Project Redevelopment
New Construction, Demolition - 79,000 SF
Design
$300,000,000 est. value
Detroit, MI 48201

2020 Bond Project - Ella White Elementary
Renovation, Addition
Bidding
Alpena, MI 49707

Gull Lake Community Schools Storage and Maintenance Buildings
Post-Bid
Richland, MI 49083

Forest View Renovations
Renovation
Post-Bid
Cadillac, MI

Construction Management Services
Results
Ann Arbor, MI

Addition To The Richfield Early Learning Center
New Construction, Renovation - 13,086 SF
Results
Flint, MI 48500

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

School & Assembly Hall
New Construction - 9,000 SF
Construction
$1,800,000 est. value
Warren, MI 48092

Seitz Middle School Pool Addition and Entry Improvements at Huntington Elementary School.
Post-Bid
Riverview, MI 48193

Meadow Brook Renovations 2019
Results
Rochester, MI

Hope Protestant Reformed Christian School - Music Room Addition
Addition - 4,170 SF
Construction
Walker, MI 49534

Northeastern Elementary Remodeling
Renovation
Post-Bid
Kalamazoo, MI

Summer Renovations
Results
Ann Arbor, MI

Interior Remodeling Work at Moraine Elementary and Thornton Creek Elementary Schools.
Renovation
Post-Bid
Northville, MI

Adams Township Schools - 2019 Construction Projects
Renovation, Addition
Results
Painesdale, MI

Reported 02/13/2021 12:00 AM
Project Title

Fife Lake Elementary Rear Entry Modifications

Physical Address View project details and contacts
City, State (County) Fife Lake, MI 49633   (Grand Traverse County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction an approximately 300 square foot entry addition and approximately 672 square feet of interior remodeling of existing space, and new driveway and bus drop. 1. Sitework; excavation, paving and associated work for new bus drop off. 2. Associated site work, excavating for building affected areas. 3. Structure is Concrete footings, steel structural frame and steel joist. 4. Interior finishes include portions of floor finishes, gypsum board walls, gypsum board bulkheads and painting. 5. Minor Mechanical, Electrical and Plumbing Systems are included at affected areas. 6. All work will be coordinated with existing structure. 7. There is no fire suppression associated with work at the elementary school.

Details

Elementary School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents