Similar Projects
Edgemont Park Playground Safety Surface Improvements
Renovation
Bidding
$500,000 est. value
Montclair, NJ 07042

The Crossings at Brick Church Station - Precast Garage
New Construction
Post-Bid
East Orange, NJ 07018

2021 Maintenance of Athletic Fields
Post-Bid
Glen Ridge, NJ

Harrison Avenue Recreation Complex Improvements
Results
Roseland, NJ 07068

Gero Park Improvements
Results
Short Hills, NJ 07078

The Station at Brick Church
New Construction, Renovation
Construction
East Orange, NJ

Renovation of Ridgewood Park
Renovation
Post-Bid
Newark, NJ 07108

Improvements to Clearman Field
Results
Belleville, NJ 07109

Arizona Beverages Pipe Bridge
Renovation
Post-Bid
Newark, NJ

Court Seven Reconstruction of Freeman Tennis Courts
Results
Glen Ridge, NJ 07028

Essex Park and Nishuane Park Improvements
Infrastructure
Post-Bid
Montclair, NJ

Degnan Park Baseball Field Improvements
Results
West Orange, NJ 07052

Provide Vailsburg Park Synthetic Turf Athletic Fields, Rubberized Track Surface and other Improvements
Infrastructure
Post-Bid
Newark, NJ

Watsessing Park Track Improvements
Results
$210,000 est. value
Newark, NJ

Furnishing, Repairing and Replacing Playground Equipment and Safety Surfaces
Renovation
Post-Bid
Newark, NJ

Reported 04/14/2022 12:00 AM
Project Title

Tennis Court Replacement at Millburn High School

Physical Address View project details and contacts
City, State (County) Millburn, NJ 07041   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect - 03/25/22
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the replacement of (5) existing Tennis Courts at the Millburn High School. The four (4) upper courts scope of work includes but is not limited to the reconstruction of new fiber reinforced asphalt surface with a subsurface drainage system. The one (1) lower court includes but is not limited crack repairs to the existing surface, with a new asphalt fiber reinforced asphalt surface. Additional improvements include a concrete border curb around the courts, sidewalks, fencing, and equipment.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents