Similar Projects
Port Monmouth Hurricane and Storm Damage Reduction Project
Alteration
Bidding
$10,000,000 to $25,000,000 est. value
NJ

Bulkhead Improvements along Comptons Creek
Infrastructure
Bidding
$510,000 est. value
NJ

Sandy Hook to Barnegat Inlet Beach Erosion Control Project Section II
Post-Bid
$10,000,000 to $25,000,000 est. value
Sandy Hook, NJ

Union Beach, Raritan Bay and Sandy Hook Bay, New Jersey Coastal Storm Risk Management Project - Phase 1 contract. Monmouth County, New Jersey
Term Contract
Post-Bid
$35,000,000 to $40,000,000 est. value
Sandy Hook, NJ

2020 Roadway and Drainage Improvement Program
Results
Marlboro, NJ

ATEC Retaining Wall Replacement
Results
Lincroft, NJ 07738

Port Monmouth Hurricane and Storm Damage Reduction Project, Phase II, Contract 4B
Term Contract
Post-Bid
$35,000,000 to $50,000,000 est. value
Middletown, NJ

Drainage Improvements at 12 Carbury Road
Infrastructure
Results
Oakhurst, NJ 07712

County Route 29A (Myrtle Avenue) Drainage Improvements
Infrastructure
Post-Bid
$70,000 est. value
Oceanport, NJ

Seeley Avenue Drainage Improvements
Infrastructure
Results
Keansburg, NJ 07734

Hillside Avenue Drainage Improvements
Infrastructure
Post-Bid
$400,000 est. value
Highlands, NJ 07732

North Porch Temporary Shoring
Infrastructure
Results
$76,969 est. value
Highlands, NJ 07732

Drainage and Sump Pump Improvements at Monmouth Avenue and Burlington Avenue
Infrastructure
Results
Bradley Beach, NJ 07720

Perimeter Drain
Infrastructure
Results
Middletown, NJ 07748

Marine Place Bulkhead Improvements
Infrastructure
Results
Highlands, NJ 07732

Last Updated 07/07/2022 03:13 PM
Project Title

Port Monmouth Hurricane and Storm Damage Reduction Project

Physical Address View project details and contacts
City, State (County) Middletown, NJ   (Monmouth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All work necessary to construct the earthen embankment levee between STA 9+90 to STA 29+80, including but not limited to the embankment, ramps, toe drain, and inspection trench, excavation and shoring. All work necessary to construct the drainage swales with erosion control matting, stormwater outlet pipes including motorized sluice gate, concrete structure for the outlet and inlet of the pipes, and electric lines, manholes, manhole covers, removal and plugging of existing culvert and utility mains, clearing, grubbing and stripping, topsoil, planting and seeding, erosion and sediment control measures, levee cellular confinement system, levee and floodwall geotextile separator, and site restoration, in accordance with the drawings and specifications.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents