Similar Projects
Calder Casino Industrial Park
New Construction, Infrastructure - 2,300,000 SF
Conception
$700,000,000 est. value
Miami Gardens, FL 33056

Honors College - Modesto Maidique Campus - Florida International University
New Construction, Infrastructure - 78,000 SF
Conception
$25,745,334 CJ est. value
Miami, FL 33174

NW North River Drive Multifamily
Demolition, New Construction, Infrastructure - 6,800 SF
Design
$50,000,000 CJ est. value
Miami, FL 33136

Eleven44
New Construction, Infrastructure - 16,607 SF
Design
$3,600,000 CJ est. value
Miami Beach, FL 33141

DB MATOC - Corrosion Facility/Wash Rack
New Construction, Infrastructure - 19,500 SF
Bidding
$25,000,000 CJ est. value
Homestead, FL 33039

Murphy Express #8999 / Medley
New Construction, Infrastructure - 2,824 SF
Bidding
$2,500,000 CJ est. value
Miami, FL 33178

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

New Park Improvements at Robert C. Welsh JR. Park
Infrastructure
Results
$185,408 CJ est. value
South Miami, FL 33143

Sidewalk Improvements-Multiple Sites
Infrastructure
Results
$827,302 CJ est. value
Miami, FL 33132

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Gateway Commerce Park - Phase 2
New Construction
Construction
Miami Gardens, FL

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Ponce Park Tower
New Construction, Infrastructure - 15,671 SF
Pending Verification
$34,000,000 CJ est. value
Coral Gables, FL 33145

Science Laboratory Complex - Modesto Maidique Campus - Florida International University
New Construction, Infrastructure - 124,462 SF
Conception
$93,130,000 CJ est. value
Miami, FL 33194

Last Updated 08/30/2022 12:34 AM
Project Title

Repair B15

Physical Address View project details and contacts
City, State (County) Coral Gables, FL 33158   (Miami-Dade County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $203,666 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Aug 16, 2022 Contract Award Number: 12405B22C0016 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LMK2NBD987Q9 Contractor Awarded Name: FDLC CONSTRUCTION MANAGEMENT PA Contractor Awarded Address: Miami, FL 33155-6301 USA Base and All Options Value (Total Contract Value): $203666.00 Renovation of Building 15 The staement of work has been adjusted and attached. Please ensure that this and the added work statements are used to create estimates. Added Questions and Answers: Q1: Is there an asbestos/lead or environmental audit of the property A1: we do not have lead/asbestos information for this building, we can address this if it comes up. Q2: Theres a ficus tree north of the building with branches encroaching over the roof. Will contractor need to trim these branches in order to maintain roof insurance Will USDA propose a minimum setback distance from the roof edge i.e. 8 ft in order to maintain insurance coverage in the foreseeable future. A2: Additional, statement of work information has been added to address this. Q3: State of utilities (water/sewer) is unknow, however safe to assume that existing sewer line is likely cast iron and portions may not be usable. Will USDA survey these lines prior to startup or will the contractor need to investigate state and notify USDA prior to conducting any floor repairs A3: ARS has no plans to do survey on the lines. If an issues arrises from this, we will address as needed. The site visit date and time have changed. The new date and time will be Wednesday July 13, 2022 at 1:00 PM. This location is still in a high COVID status and the site visit will be restricted to 5 people. Please imit the number of people you request for attendance. If additional dates and times are needed they can be added at the point of need. Please ensure that you provide your attendance request with the company name and name of attendees to lynn.hults@usda.gov by the close of business the day prior. A site visit has been set for this solicitation on Monday July 11, 2022 at 10am. Renovation of Building 15 Renovation of Building 15 Please provide the name of the comapny and names of personnel requesting to attend to lynn.hults@usda.gov This is a Combined Synopsis/Solicitation. The Solicitation Number 12405B22Q0214. The Associated NAICS code is 236220 (Commercial and Institutional Building Construction), with a small business size standard of $39.5 Million. USDA, ARS, SHRS 13601 Old Cutler Road Miami, FL 33158 Needs the Renovation of Building 15 that fits the associated Statements of Work and Specifications. The Government anticipates award of a Firm Fixed Price contract. Each offer must show a breakdown giving price of each element, provide description literature or information showing that the offered service meets all parts of the Statement of Work and Specifications. Electronic submissions are preferred. Please email all quotes to lynn.hults@usda.gov. NO LATE QUOTES WILL BE ACCEPTED. To be eligible for an award, all contractors must be registered in the System for Award Management (SAM). A contractor can contact SAM by calling 1-866-606-8220 or email at www.sam.gov. NO EXCEPTIONS. A UEI (Unique Entity ID) number is required in order to register. All invoices shall be submitted and paid electronically. Quotes must be received no later that Friday August 5, 2022, 4:00 pm Central Standard Time (CST). Questions regarding this combined synopsis/solicitation are due no later than 3:00 PM CST on Friday July 29, 2022. Answers to any questions received by that time will be posted as an amendment to this combined synopsis/solicitation.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents