Project Title | Trinity River Drive (FM 624 to Wood River Drive) Bond 2020 |
Physical Address | View project details and contacts |
City, State (County) | Corpus Christi, TX 78410 (Nueces County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,952,588 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes a complete reconstruction of Trinity River Drive ("Trinity River") from FM 624 to Wood River Drive, a distance of 1,010 linear feet. Trinity River Drive is a Residential Collector and should contain parking lanes on each side of the road and one (1) travel lane in each direction. Ardurra designed the reconstructed roadway accordingly with 9'-wide parking lanes and 11'-wide travel lanes in each direction. The new roadway will include 6" standard curb and gutter and 5'-wide, tied sidewalks on each side of the road. This lane configuration will be constructed from Wood River Drive to River Walk Drive. South of River Walk Drive, the new roadway will transition to one (1) 12'-wide, north-bound travel lane, a 14'-wide dedicated left-turn lane, and a 14'-wide straight/right-turn lane at the intersection with FM 624. The parking lanes will terminate on the north side of River Walk Drive. The pavement width will remain the same at 44' back-to-back throughout the Project Limits. Additional surface improvements include curb ramps and driveways. For this project there are two (2) base bids, one for HMAC pavement and one for Concrete pavement. The existing ACP waterlines will be removed and replaced with 8" C900 PVC waterlines, and the existing fire hydrants will be salvaged and replaced with new fire hydrants. The existing 8" VCP wastewater lines will be removed and replaced with 8" C900 DR18 (Green) PVC and the manholes will be removed and replaced with new 4' diameter fiberglass manholes. It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and or Bids Amounts. Bidders are advised to refer to Request for Bids Section 5 of the bidding documents for a list of required bid submittals. Failure to submit or upload all required documents may result in an irregular or non-responsive bid submittal. The deadline to ask questions is 2/01/2023 4:00 PM CST. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |