Similar Projects
North Highland Avenue Road and Drainage Improvement Phase I
Infrastructure
Bidding
$2,260,000 est. value
Clearwater, FL 33755

Seawall Construction - 17th Avenue
Infrastructure
Bidding
Saint Petersburg, FL 33706

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

Seawall Maintenance, Repair and Related Services
Results
Less than $900,000 est. value
Saint Petersburg, FL 33731

Drainage Improvements for Seventh, and Eighth Street - BMP 5
Results
$240,605 to $298,766 est. value
Belleair Beach, FL 33786

Undergrounding Utilities Along Gulf Boulevard - Phase II
Post-Bid
Indian Rocks Beach, FL 34635

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Creek Shoreline Restoration
Results
Less than $600,000 est. value
Saint Petersburg, FL 33711

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Crystal Beach Paving and Drainage Improvements (Pid 002932A)
Results
Less than $1,569,134 est. value
Clearwater, FL

2021 Seawall and Stormwater Imrpovements - Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Drainage - SR 699
Results
$1,783,400 est. value
FL

2021 Seawall and Stormwater Improvements-Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL

Last Updated 02/03/2022 02:46 AM
Project Title

Cedarwood and Lyndhurst CMP Replacement and Ditch Stabilization

Physical Address View project details and contacts
City, State (County) Dunedin, FL   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $589,774
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of four 48” Corrugated Metal Pipes (CMPs) and replacement with 50 Linear Feet of 4’x6’ concrete box culvert, replacing existing sand cement headwalls/wingwalls with reinforced concrete headwalls/wingwalls, replacement of a 12” CMP with 32 LF 15” Reinforced Concrete Pipe (RCP) and a Mitered End Section (MES), replacement of a 24” CMP with 35 LF of 24” RCP and a Florida Department of Transportation (FDOT) Type C inlet and a MES, removal of a 54” headwall and replacement with a FDOT 54” U-Type end wall, construction of approximately 5,600 square feet of slope reinforcement with rubble riprap, and removing 1.18 acres of vegetation which includes the removal of trees and pruning of branches as identified on the plans. Additionally, the project includes restoration of pavement and minor grading activities along the ditch bottom which are both earthen (downstream of Lyndhurst crossing) and concrete (upstream of Lyndhurst crossing).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents