Similar Projects
Asia Pacific Cultural Center Expansion
Addition, Infrastructure - 10,100 SF
Design
$10,000,000 est. value
Tacoma, WA 98409

Langley Middle School Gym Seismic Retrofit
Renovation - 15,800 SF
Post-Bid
Langley, WA 98260

Solid Core
Renovation - 2,028 SF
Post-Bid
Seattle, WA

Adna High School Gym Addition
Addition, Demolition, Infrastructure
Bidding
$1,200,000 CJ est. value
Adna, WA 98522

South Lake Union the Mercer Blocks
New Construction - 890,000 SF
Design
$20,000,000 est. value
Seattle, WA 98109

Multi-Purpose Sports Complex
New Construction
Post-Bid
$4,925,000 to $6,590,000 est. value
Centralia, WA 98531

Seattle Storm Practice Facility
New Construction - 10,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Seattle, WA 98119

Redmond Senior & Community Center
New Construction
Design
$44,000,000 est. value
Redmond, WA 98052

Central Washington University Nicholson Pavilion
Renovation, Addition
Design
Ellensburg, WA 98926

Wenatchee Valley Ymca New Facility
New Construction, Infrastructure
Conception
$22,000,000 est. value
Wenatchee, WA 98801

University of Washington Basketball Training & Operations Facility
New Construction
Design
$53,000,000 est. value
Seattle, WA 98195

Olympic Valley Elementary School
New Construction
Conception
$67,000,000 est. value
Oak Harbor, WA 98277

Southwest Athletic Complex Netting
Infrastructure
Bidding
$330,000 CJ est. value
Seattle, WA 98126

Crescent Harbor Elementary School
New Construction
Conception
$68,000,000 est. value
Oak Harbor, WA 98277

Tacoma Financial Center Improvements
Renovation - 200,000 SF
Design
Tacoma, WA 98402

Last Updated 07/28/2022 10:10 AM
Project Title

2022 - Boistfort Gym Seismic Retrofit

Physical Address View project details and contacts
City, State (County) Klaber, WA 98538   (Lewis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,900,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

** This project has been awarded to Schwiesow Construction. ** Seismic upgrade project to the Boistfort Consolidated School Gymnasium and Food Service Facility. Work includes structural upgrades to foundations, bearing and shear walls and roof connections. Architectural finishes to be replaced where structural work is being completed. Mechanical and electrical systems will be updated to comply with seismic standards. Please direct questions regarding this project to the office of the Consultant, Degenkolb Engineering, 600 University St, Seattle, WA 98101 206-340-8114 No contractor may withdraw his bid after the hour and date set for the submittal thereof, or thereafter, before award of the Contract, unless award is delayed for a period exceeding forty-five (45) days from the proposal submittal date. The Owner reserves the right to accept or reject any or all proposals and to waive informalities. The first subcontractor list (HVAC, mechanical, and electrical) is due within one (1) hour of this bid time. The second subcontractor list (structural steel installation and rebar installation) is due within forty-eight (48) hours of this bid time. Bid Date: Part 1: Thursday, June 9, 2022, 2:00pm PS Part 2: Thursday, June 9 ,2022, 3:00 pm PST Part 3: Thursday, June 14,2022, 2:00 pm PST

Details

Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents