Similar Projects
Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

Mineral Point - Spring Green Const / Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Loganville, WI 53943

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Privately Owned Vehicle Parking Reconstruction - GPC
Infrastructure, Renovation
Bidding
$435,000 CJ est. value
Reedsburg, WI 53959

Privately Owned Vehicle Parking Reconstruction
Infrastructure, Renovation
Bidding
$435,000 CJ est. value
Reedsburg, WI 53959

Village Forest Park Project - Playground Development
Infrastructure - 2,500 SF
Post-Bid
$540,000 CJ est. value
Baraboo, WI 53913

Bluff View Condominiums
New Construction, Infrastructure
Post-Bid
$32,000,000 CJ est. value
Baraboo, WI 53913

2021 Vault Toilet Replacement Group 2
Demolition, New Construction, Infrastructure
Results
$278,000 CJ est. value
Baraboo, WI 53913

2022 South Shore Road Reconstruction
Infrastructure
Results
$1,151,445 CJ est. value
Baraboo, WI 53913

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Baraboo VA Outpatient Clinic
New Construction, Infrastructure - 11,300 SF
Pending Verification
$7,000,000 CJ est. value
Baraboo, WI 53913

Tomah - Portage - Const/Pav't Repair/Shldr/Pipe/Psrs
Demolition, New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Rock Springs, WI 53961

Retzlaff Drive Extension
Infrastructure
Bidding
$260,000 CJ est. value
Reedsburg, WI 53959

Last Updated 08/24/2023 11:12 AM
Project Title

Kalahari Resorts and Conventions Expansion / Wisconsin Dells

Physical Address View project details and contacts
City, State (County) Baraboo, WI 53913   (Sauk County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

*As of August 24, 2023, construction is underway and all trades are let. Kraus-Anderson Construction Company has been pre-selected as the Construction Manager to facilitate the construction of Kalahari Resorts - New Hotel at Lake Denton, WI. BP-02 will be the hard bid for the MEP, wood structure (north of the podium) and finishes trades . Major trades to include, but not limited to: wood framing, roofing, windows, EIFS, stone veneer, drywall, ACT, flooring, painting, cabinetry, and all trades associated with the connector skywalk. *Masonry and structural steel have already been awarded. This project consists of two and three story wood frame over precast podium base - Fully Sprinkled for Kalahari Resorts (Owner) and consists of approximately 143,291 square feet and 237 units. The work will be constructed in one (1) phase with multiple procurement packages in accordance with the Project Schedule. *project schedule will be finalized and sent out later along with future addendum. "All qualified applicants/bids will receive consideration for employment without regard to race, color, creed, religion, national origin, sex, sexual orientation, disability, age, marital status, status with regard to public assistance, protected veteran status, or any other protected characteristic. Kraus-Anderson(R) Construction Company is an Equal Opportunity Employer and hereby provides notice of its compliance with 41 C.F.R. 60-1.4; 41 C.F.R. 60-4.2; 41 C.F.R. 60-4.3; 41 C.F.R. 60-250.5; 41 C.F.R. 60-300.5; 41 C.F.R. 60-741.5; 41 C.F.R. 61-300.10; and 29 C.F.R. Part 471 Appendix A to Subpart A, which are hereby incorporated by reference." *Updated subcontractor contracts & riders ****ATTENTION ALL PROSPECTIVE BIDDERS*** Kraus-Anderson has updated our master contracts and contract riders. They have been uploaded. Please download and review thoroughly. Any questions can be direct to PM Mark Breidel. *RFI's Attached is a closed RFI Log as of 5/22/2023 for your use as they apply.

Details

4 Stories Above Grade, 143,291 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents