Similar Projects
F-35 Add/Alter Squadron Operations 404
Renovation, Addition - 4,300 SF
Design
$1,000,000 to $5,000,000 est. value
Madison, WI

Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

Fort McCoy Transient Training Barracks Design-Build RFP
Post-Bid
$10,000,000 to $25,000,000 est. value
Sparta, WI 54656

F35 Flight Simulator Facility
Post-Bid
$10,000,000 to $25,000,000 est. value
Madison, WI 53704

Readiness Center Renovation Phase 2 - MEP Bidders
- 35,000 SF
Results
Less than $4,900,000 est. value
Milwaukee, WI 53212

Facilities Maintenance Building - MEP Bidders
Results
$780,000 est. value
Chippewa Falls, WI 54729

Market Survey for Manitowoc WI, FFR Renovations (Design Build)
Renovation, Addition - 14,978 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Manitowoc, WI

Armory Remodel Phase 2 - MEP Bidders
Results
$2,399,900 est. value
Madison, WI 53704

Industry Day for Manitowoc FFR
Renovation - 12,578 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Manitowoc, WI

Armory Remodel Phase 2 - GC Bidders
Results
Less than $2,399,900 est. value
Madison, WI 53704

Facilities Maintenance Building - GC Bidders
Results
Less than $780,000 est. value
Chippewa Falls, WI 54729

Armory Relocation
Results
Less than $259,650 est. value
Stanley, WI 54768

Headquarters Remodeling - MEP
Renovation - 12,000 SF
Results
Less than $2,300,000 est. value
Madison, WI 53704

Headquarters Remodeling - General
Renovation - 12,000 SF
Results
Less than $2,300,000 est. value
Madison, WI 53704

Last Updated 10/13/2020 09:15 AM
Project Title

Readiness Center Renovation Phase 2 - General Prime Contractors

Physical Address View project details and contacts
City, State (County) Glendale, WI 53212   (Milwaukee County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of office and classroom spaces, renovate and add new toilet and shower rooms, new finishes, new elevator and new accessible entrance on the south side of the building. The new fire protection, plumbing, HVAC, lighting, power and communications systems that were provided during Phase I will be reconfigured for the new layout as needed. The renovation will mainly take place in the Administrative Wing. There is also some work in the Drill Hall Wing on the west side of the second floor.

Details

Military Facility, 35,000 SF Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents