Similar Projects
Grand Estates Phase II
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Yerington, NV 89447

The Traditions Phase 3
New Construction, Infrastructure
Design
$23,000,000 CJ est. value
Yerington, NV 89447

US 50, Construct Road and Bridge
New Construction, Infrastructure
Bidding
$71,000,000 CJ est. value
Silver Springs, NV 89429

Well 8 Replacement Project (Drilling Only)
Infrastructure
Bidding
$437,300 CJ est. value
Smith Valley, NV 89444

Cottonwood Lane Drainage and Road Reconstruction Project
Infrastructure
Post-Bid
$3,500,000 CJ est. value
Fernley, NV 89408

Coldmill and Place Plantmix Bituminous Surface With Open Grade
Infrastructure
Post-Bid
$16,500,000 CJ est. value
Silver Springs, NV 89429

Villa Park Pavement, Sewer and Water Replacement
Infrastructure
Results
$2,852,000 CJ est. value
Fernley, NV 89403

Rolling 'A' Wastewater Treatment Facility - Phase 4 Expansion
Addition, Demolition, New Construction, Infrastructure
Results
$19,990,000 CJ est. value
Dayton, NV 89403

Holiday Inn / Fernley
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Fernley, NV 89408

Highway 95A Solar Power Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Yerington, NV 89447

US50A/US95A Sanitary Sewer Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Fernley, NV 89403

2023 County Road Resurfacing
Infrastructure
Results
$3,981,007 CJ est. value
Smith, NV 89430

Nevada Commerce Center
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Fernley, NV 89408

Fairground Drainage & Pavement Project
Infrastructure
Post-Bid
$168,720 CJ est. value
Yerington, NV 89447

Stanley Drive Commercial
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Fernley, NV 89408

Last Updated 02/14/2024 04:41 PM
Project Title

Winston Solar Power

Physical Address View project details and contacts
City, State (County) Yerington, NV 89447   (Lyon County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of a photovoltaic (PV) solar power generating facility including an on-site substation, on-site operations and maintenance building. Location is north side of Sierra Drive approximately 0.5 mile east of the US 95A/Sierra Drive intersection. As of February 13, 2024, the plans were been approved by the Lyon County Planning Commission on September 1, 2022. The project is going through regulatory approvals with the State of Nevada Public Utilities Commission. Application filed March 2023. A general contractor has not been announced. A firm construction timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents