Similar Projects
Last Updated | 02/14/2024 04:41 PM |
Project Title | Winston Solar Power |
Physical Address | View project details and contacts |
City, State (County) | Yerington, NV 89447 (Lyon County) |
Category(s) | Heavy and Highway, Industrial/Manufacturing |
Sub-Category(s) | Power Plant, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Construction start expected October 2024 |
Bids Due | View project details and contacts |
Estimated Value | $30,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the construction of a photovoltaic (PV) solar power generating facility including an on-site substation, on-site operations and maintenance building. Location is north side of Sierra Drive approximately 0.5 mile east of the US 95A/Sierra Drive intersection. As of February 13, 2024, the plans were been approved by the Lyon County Planning Commission on September 1, 2022. The project is going through regulatory approvals with the State of Nevada Public Utilities Commission. Application filed March 2023. A general contractor has not been announced. A firm construction timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |