Similar Projects
SR 826/Palmetto Expressway Capacity Improvement Project (FPID)
Bidding
Miami Lakes, FL 33014

Resurfacing
Bidding
$6,024,990 est. value
FL

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Miami Circle
Post-Bid
Miami, FL 33131

Roadway Improvements Project - Northeast 125th Street
Results
North Miami, FL 33161

Miscellaneous Roadway and Drainage Improvements
Results
Cutler Bay, FL 33189

Intersection Improvement
Bidding
$4,726,324 est. value
FL

DMS Courtyard Replacement
Post-Bid
Miami, FL 33128

Push Button Roadway Resurfacing-North
Results
Less than $1,620,984 est. value
Miami, FL

Railroad Intersection Improvement
Bidding
$34,326,701 est. value
FL

Jackson North Medical Center Asphalt Repairs (SBE Set Aside)
Post-Bid
Less than $50,000 est. value
Miami, FL 33169

Push Button Roadway Resurfacing- South
Results
Less than $1,620,984 est. value
Miami, FL

Push Button Intersection Improvements-North
Bidding
$1,583,934 est. value
FL

Rickenbacker Causeway Green Bike Lanes Segment A - Phase I
Post-Bid
Less than $1,950,000 est. value
Miami, FL 33128

207th Street Right Lane Extension
Results
Less than $302,280 est. value
Miami Gardens, FL 33056

Last Updated 07/28/2020 07:20 AM
Project Title

SR-90/US Hwy-41/Tamiami Trail From Structure S-333 to Structure S-334

Physical Address View project details and contacts
City, State (County) FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construction of the SR 90 (Tamiami Trail) roadway reconstruction from east of Structure S-333 (MP 13.85) to east of S-334 (MP 24.42) in Miami-Dade County. Project includes the reconstruction of the existing two-lane roadway and shoulders within the project limits from MP 13.85 to MP 24.42. The project includes realigning and raising the profile of the existing roadway approximately two feet, placement of geotextiles for roaday and base reinforcement, utility coordination, construction of 8 drainage culverts, 6 bridges, construction of drainage swales and harmonizing the proposed roadway to adjacent properties and canals within the project limits. The Design Build Firm shall not undertake any earth disturbing activities in front of the Osceola Camp beginning at MP 14.032 and continuing through MP 14.448. To ensure no activities occur in this area, the endpoints shall be staked and marked as a no-work zone.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents