Similar Projects
Independent Senior Living Apartments, Memory Care and Assisted Living Facilities
New Construction, Renovation, Addition, Demolition - 113,438 SF
Conception
Wyandotte, MI 48192

Perrineville Residential Condominium
New Construction
Conception
Westland, MI 48185

Pope Francis Center: Bridge Housing (Short-Term Housing Project)
New Construction - 60,536 SF
Design
Detroit, MI 48208

Canton Shareef Condominiums
New Construction
Design
Canton, MI 48188

MLK - Apartments
New Construction - 27,400 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Detroit, MI 48201

Helzberg Diamond #135
Renovation - 1,592 SF
Post-Bid
Taylor, MI 48180

Filmore Place - Phase I and Phase II
New Construction - 154,000 SF
Post-Bid
Canton, MI 48187

Fire Damage Renovations
Renovation
Results
Detroit, MI

Allen Terrace Interior Improvements and Exterior Renovations
Renovation
Results
Northville, MI 48167

Book Tower & Book Building Redevelopment
Renovation - 517,000 SF
Construction
$313,000,000 est. value
Detroit, MI 48226

Book Tower & Book Building Redevelopment
Renovation - 517,000 SF
Construction
$313,000,000 est. value
Detroit, MI 48226

Hines View Apartments
New Construction - 4,931 SF
Pending Verification
Westland, MI 48185

West McNichols Road Development
New Construction, Demolition - 6,595 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Detroit, MI 48221

Berkshire Apartments
New Construction
Conception
Canton, MI 48187

Meyers Senior Apartments
New Construction, Renovation
Design
Detroit, MI 48209

Last Updated 05/31/2022 10:32 AM
Project Title

The Residences @ 150 Bagley

Physical Address View project details and contacts
City, State (County) Detroit, MI 48226   (Wayne County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Retail
Contracting Method
Project Status Permitting, Construction Start Expected June 2022, Construction Completion Expected fourth quarter 2023, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $75,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

210,500 SF - Retail, 10,500 SF Renovation, 1 Apartments/Condominiums, 18 Stories Above Grade, Approximately 200,000 SF Renovation 148 Unit(s).
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents