Similar Projects
Lehi City Debris Removal Contractor Prequalification
Post-Bid
Lehi, UT 84043

UDOT Litter Collection
Term Contract
Post-Bid

Snow Removal Services USDB Springville Campus
Results
Springville, UT 84663

Refuse Service for the Springville ABC Store #45
Term Contract
Results
Less than $4,000 est. value
Springville, UT 84663

Waste Disposal Management
Term Contract
Post-Bid
Highland, UT 84003

Spanish Fork Airport Fill
Post-Bid
Spanish Fork, UT 84660

Residential Curbside Solid Waste and Recycling Collection, Transportation, and Disposal Services
Term Contract
Post-Bid
Highland, UT 84003

Waste and Recycling Collection Services
Term Contract
Post-Bid
Lindon, UT 84042

Region 3 Oil Water Separators, Sumps, Trenches, Pits, and Floor Drain Cleaning Including Disposal
Term Contract
Post-Bid
Eureka, UT 84628

Garbage and Recycling Collection 2022
Post-Bid
Spanish Fork, UT 84660

Refuse Service for Pleasant Grove ABC Store
Term Contract
Post-Bid
$5,000 est. value
Pleasant Grove, UT 84052

Snow Removal for ABC Store 44
Term Contract
Post-Bid
Pleasant Grove, UT 84062

Garbage Disposal and Dumpster Service UDOT Region 3
Post-Bid

Snow Removal for ABC #45 and Spanish Fork Vet Lab
Post-Bid
Spanish Fork, UT 84660

Refuse Service for the Spanish Fork Veterinary Laboratory
Term Contract
Post-Bid
Spanish Fork, UT

Last Updated 11/17/2020 05:35 PM
Project Title

Snow Removal for Saratoga Springs ABC Store

Physical Address View project details and contacts
City, State (County) Saratoga Springs, UT 84085   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For Snow removal service for the Areas to be Serviced: Saratoga Springs ABC Store, 1285 North Exchange Drive, Saratoga Springs, Utah 84085 A. Snow shall be removed from driveways and parking areas at the location after an accumulation of 2 inches or as requested and shall be accomplished prior to 7:00 AM or per request by DFCM Coordinator. B. Contractor shall provide all equipment and supplies to perform work required in this specification.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents