Similar Projects
Blueberry Hill Road A-007 - 24317 - Taos County
Infrastructure
Conception
$7,888,000 CJ est. value
El Prado, NM 87529

Blueberry Hill Road A-007 - 24317 - Taos County
Infrastructure
Conception
$7,888,000 CJ est. value
El Prado, NM 87529

Maverik Convenience Store And Fuel Station
New Construction
Design
$1,000,000 to $5,000,000 CJ est. value
Taos, NM 87571

Carson National Forest Drinking Water Well Drilling Project
Infrastructure
Bidding
$100,000 CJ est. value
Taos, NM 87571

NM Flap Tao Cb110(1) Veterans Memorial Road
Term Contract
Post-Bid
$2,000,000 to $4,000,000 est. value
Ranchos de Taos, NM 87557

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Taos County Veterans Cemetery
New Construction, Infrastructure - 592 SF
Results
Taos, Taos Pueblo, NM

Rainbow Boulevard Improvements Project
Infrastructure
Results

New Terminal - Taos Regional Airport - Town of Taos
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
El Prado, NM 87529

Electric Vehicle Charging Station
New Construction, Infrastructure
Pending Verification
$200,000 CJ est. value
Questa, NM 87556

Electric Vehicle Charging Station
New Construction, Infrastructure
Conception
$200,000 CJ est. value
Red River, NM 87558

Livestock Well and Watering System
Infrastructure
Post-Bid
$160,000 CJ est. value
Ojo Caliente, NM 87549

Construction Administration for NP 709 - Rio Lucero Road
Infrastructure
Results
Taos, NM 87571

Road Construction / Materials for FY 2022/23
Infrastructure
Post-Bid
Red River, NM

SD FTBL Horse Soldier BCB(1) Horse Soldier Road to Fort Meade
Term Contract
Results
$2,000,000 to $5,000,000 est. value
Ranchos de Taos, NM

Last Updated 01/23/2023 09:37 AM
Project Title

Taos Plaza Electric Vehicle Charging Stations

Physical Address View project details and contacts
City, State (County) Taos, NM 87571   (Taos County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of two stations. Scope details have not been released. As of January 23, 2023 the project is in early planning stage. A planning application has not been submitted to the Town of Taos. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the summer of 2023.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents