Similar Projects
Signaw River Dredging
Infrastructure
Design
$500,000 CJ est. value
Morton, IL 61733

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Results
Delavan, IL

Illinois Central College Campus Pavement
Infrastructure
Post-Bid
$185,000 est. value
East Peoria, IL 61635

Crack and Joint Sealing on US 24/IL 9 From N of Pfeiffer Rd in Bartonville to 0.16 Mi SW of IL 9 (e.) and on IL 29 From Margaret Drive in Creve Coeur to N of Lasalle Blvd
Infrastructure
Results

Hot-Mix Asphalt Resurfacing of Harding Road in Morton Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL 61550

Bridge Washing of Nine (9) Bridges Over the Illinois River
Infrastructure
Results

Hot-Mix Asphalt Resurfacing of Broadway Road in Tremont Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL 61550

Street Reconstruction of Hilldale Avenue and Avon Ct
Infrastructure
Results
$1,818,517 est. value
Washington, IL

Hot-Mix Asphalt Resurfacing of Various Roads in Morton Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL

Sealcoating and Fog Coat
Infrastructure
Results
Morton, IL

Sampson Street Reconstruction
Infrastructure
Post-Bid
$400,000 est. value
Tremont, IL 61568

Street Maintenance-Mill and Overlay
Infrastructure
Results
Morton, IL

Last Updated 07/25/2023 02:07 PM
Project Title

Resurfacing and Intersection Improvements on Court Street

Physical Address View project details and contacts
City, State (County) Morton, IL 61568   (Tazewell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin. Region 3 District 4 Federal Project # Emyf(921) County(S) Tazewell Key Route(S) Fap 693 Marked Route(S) Court Street Section(S) 20-00196-00-rs (Pekin) State Job #(S) C-94-025-21 Pps #(S) 4-10687-0000 Completion Date is 150 Working Days Questions not accepted as of July 25, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 065 - Resurfacing and Intersection Improvements on Court Street The Joint Venture cut-off date is 4:30 PM prevailing local time, July 28, 2023. The Authorization to Bid request cut-off date is 4:30 PM prevailing local time, August 01, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents