Similar Projects
Jibboom, Bridge, and Church Streetscape Improvements - C1806 - Town of Truckee
Alteration
Conception
$7,000,000 est. value
Truckee, CA

West River Street Site Redeveopment - C1817 - Town of Truckee
Infrastructure
Conception
$474,000 CJ est. value
Truckee, CA 96161

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Operational Improvement to Make Existing Roadway Turnout Standard Width With Shoulders
Infrastructure
Design
$6,434,000 CJ est. value
Penn Valley, CA 95946

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Post-Bid
$22,300,000 est. value
CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Excavate Roadway, Place Cl2-AB and HMA (Type A) to Construct Turnouts
Infrastructure
Results
$1,230,000 est. value

Roadway Excavation, Hma (Type a) with Class 2 Ab, Rcb Culvert and Rcp
Infrastructure
Results
$41,000,000 est. value
CA

Mougle Lane/Pioneer Trail Connector Trail - C2304 - Town of Truckee
Infrastructure
Conception
$3,700,000 CJ est. value
Truckee, CA 96161

O'Reilly Auto Parts / Grass Valley - Rebid
Demolition, New Construction, Infrastructure - 8,694 SF
Post-Bid
$1,400,000 CJ est. value
Grass Valley, CA 95945

Install Rockfall Drapery Systems & roadway excavation.
Infrastructure
Results
$8,000,000 est. value

Downtown Streetscape Improvements
New Construction, Infrastructure
Post-Bid
Grass Valley, CA

Roadway Excavation, HMA (Type A) with Class 2 AB, RCB Culvert and RCP
Infrastructure
Results
$40,000,000 est. value
CA

Parking Lot Sweeping Service
Term Contract
Post-Bid
Truckee, CA 96161

Crack Seal Taxiway A Crack Seal and Slurry Seal Ramp 2
Infrastructure
Results
Grass Valley, CA 95945

Last Updated 08/16/2022 11:13 AM
Project Title

Martis Creek Lake Trail - C2303 - Town of Truckee

Physical Address View project details and contacts
City, State (County) Truckee, CA 96161   (Nevada County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construction of a 3.5 miles of a class 1 paved trail connecting the Truckee River Legacy Trail at the Riverview sports park to Martis Creeklake and Dam and the Truckee River Legacy trail at in the Glenshire subdivision. Project is included in the Town of Truckee's FY 2022-2027 Budget CIP. As of August 16, 2022, information regarding a design team or a general contractor is not available. Design is anticipated in FY 2023/2024 and construction is anticipated after FY 2026/2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents