Similar Projects
East Yancey County Sewer Improvements Phase 2
Post-Bid
Less than $700,000 est. value
Burnsville, NC 28714

Mount Mitchell SP-Upgrades to Existing Septic System
Post-Bid
Burnsville, NC 27699

Nash Street Sanitary Sewer Extension
Results
Sanford, NC 27237

Grease Traps
Results
Fort Bragg, NC 28310

Grease Trap Services
Term Contract
Post-Bid
Goldsboro, NC 27530

2018 Golden LEAF Disaster Recovery Project Contract No. 2 - Sanitary Sewer and Storm Sewer
Results
Parmele, NC

Harris Creek Sewer
Post-Bid
Raleigh, NC 27604

West Neuse Interceptor, Upper Walnut Creek Interceptor and Neuse River East Parallel Interceptor
Results
Raleigh, NC

Phase II - Sewer System Evaluation Survey Clean and CCTV Inspection Contract
Post-Bid
Beaufort, NC

Crabtree Creek and West Neuse Interceptor Rehabilitation
Results
Less than $12,000,000 est. value
Raleigh, NC 27601

Orange County Public Transportation Administrative Building Sanitary Sewer Improvements
Post-Bid
Hillsborough, NC 27278

2017 Water and Sewer System Improvements
Results
Pine Level, NC 27568

Operation Maintenance and Mangement of Water and Wastewater Systems
Term Contract
Post-Bid
Wentworth, NC 27375

Schenck Job Corps Center Sewer Line Repairs
Results
$25,000 to $100,000 est. value
Pisgah Forest, NC 28768

J045--Grease Trap Pumping Services
Post-Bid
Salisbury, NC

Last Updated 01/27/2022 11:40 AM
Project Title

CDBG-I Sewer Rehabilitation/Replacement Project

Physical Address View project details and contacts
City, State (County) Kenly, NC 27542   (Johnston County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the rehabilitation of approximately 5,980 LF of 8-inch existing gravity sewer line, 2,260 LF of 12-inch existing gravity sewer, and 32 manholes along Lincoln Drive, W. 7th Street, W. 6th Street, N. Church Street, N. Gardner Avenue, Tilghman Street, N. College Avenue, and E. 3rd Street. The rehabilitation will include the replacement and reconnection of 126 sewer connections and approximately 4,410 LF of 4-inch sewer laterals. Priority areas are along Tilghman, N Gardner, W Sixth, W Seventh, and Lincoln streets. If time and budget allow, the project may include additional areas of W Sixth, Tilghman, N Church, N Alford, E Third, and N College streets.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents