Similar Projects
World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Bowling Green WPC ATAD Tank Cover Replacement
Results
Less than $750,000 est. value
Bowling Green, OH 43402

API 653 External Tank Inspection
Post-Bid

Ampoint Water Main Replacement - Phase I Wl-139E
Results
Less than $1,500,000 est. value
Bowling Green, OH 43402

Village of Bradner-Caldwell Street Waterline Improvements
Infrastructure
Post-Bid
Less than $331,526 est. value
Bradner, OH 43406

Luckey Area Water Tower Aeration and Mixing Improvements Wl 183L (A)(1)
Results
Less than $100,000 est. value
Bowling Green, OH 43402

Liner Pipe / Cured-In-Place-Pipe (Cipp) / Joint Seals
Term Contract
Results

Rossford Tree Streets Waterline Improvements
Results
Less than $740,200 est. value
Bowling Green, OH 43402

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Water Main Improvements
Results
Less than $1,890,000 est. value
Bowling Green, OH 43402

Wood Streets Waterline Replacement
Results
Less than $872,000 est. value
Bowling Green, OH 43402

WL-100 Area Elevated Storage Tank
Results
Less than $4,400,000 est. value
Bowling Green, OH 43402

Wales Road Clearwell Flow Meter Improvements
Results
Less than $120,000 est. value
Rossford, OH 43460

Last Updated 06/15/2021 02:57 PM
Project Title

Contract A- North Baltimore Waterline Improvements and Contract B- 500000 Gallon Elevated Water Storage Tank

Physical Address View project details and contacts
City, State (County) North Baltimore, OH   (Wood County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $741,000 to $1,886,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract A- consist of furnishing and installing approximately 2,100 lineal feet of water and appurtenances Contract B- consist of furnishing and installing a 5000,000-gallon spheroid elevated tanks and appurtenances. Project Estimated Cost Contract A- 741,000 Contract B- 1,886,000

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents