Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Construction of Lift Station 1 Relocation
New Construction
Bidding
Maitland, FL

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Orange County Utilities Pump Station Package 40
Post-Bid
$2,068,770 est. value
FL

Park Masterlift Station Replacement
Results
Eatonville, FL 32751

Lift Station No. 45 Replacement
Results
Less than $6,500,000 est. value
Orlando, FL 32802

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Utilities Pump Station Improvements Package 24
Bidding
$2,160,127 est. value
Belle Isle, Orlando, FL 32812

Moss Park Lift Station and Electrical Upgrades
Post-Bid
$1,400,000 est. value
Orlando, FL 32832

Lift Station #17 Rehabilitation
Results
Less than $350,000 est. value
Maitland, FL 32751

Package 11 Pump Station Improvements
Results
Less than $1,627,290 est. value
Orlando, FL 32818

Orange County Pump Station Package 16 Improvements
Results
Less than $2,182,304 est. value
Orlando, FL 32801

Lift Station 218 Relocation
Results
Less than $1,900,000 est. value
Orlando, FL 32802

Pump Station Package 23 Improvements
Results
Less than $2,116,000 est. value
Orlando, FL 32801

Oakland Lift Station No.5 and Force Main Improvements
Results
Less than $455,697 est. value
Oakland, FL 34760

Last Updated 10/09/2020 04:04 PM
Project Title

Lake Apopka North Shore Interconnect Pump Station

Physical Address View project details and contacts
City, State (County) Apopka, FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,340,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide a pump system to move water from the Duda central portion of the Lake Apopka Shore (LANS) to the east side of the LANS. The project consists of the construction of a transfer pumping station, an earthen berm with controlled culverts across lake level canal, and a controlled culvert from the lake level canal to the east side of the LANS

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents