Similar Projects
Last Updated | 09/13/2022 02:34 PM |
Project Title | Pump Station No. 6 and 9 Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Coos Bay, OR 97420 (Coos County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Pre-Qualification: Yes Site Directions: Schedule A - Pump Station No. 6 Upgrades The project site is located at 400 Kruse Avenue in Coos Bay, Oregon and is situated at the northwest intersection of Kruse Avenue and South 5th Street. For more specific locations, see the location and vicinity maps on the Plans. Schedule B - Pump Station No. 9 Upgrades The project starting location is located at 1890 Southwest Boulevard. For more specific locations, see the location and vicinity maps on the Plans. Project Category Code: Water/Wastewater Infrastructure, Water and Wastewater Facilities Description: Schedule A - Pump Station No. 6 Upgrades a. The new pump station will include three non-clog submersible sewage pumps to replace the existing pumps, rails, bases, diesel backup generator and canopy, replacement of the existing electrical building with a new electrical building, instrumentation, electrical power, controls, lighting, piping, valves, fittings, flow meter, coatings, chemical feed system, rehabilitation of the existing wet well including new lid and hatches, lining existing wet well, gravity sewer lines, manhole, catch basin, excavation, backfill, grading, concrete site work, asphalt, fencing, landscaping, any other miscellaneous site improvements. b. Work also includes all temporary structures, dewatering, temporary bypass pumping, incidental piping, power and control facilities to maintain a continuous pump station, all specified delivery acceptance tests and inspections, installed tests and inspections, and operational testing and commissioning. Schedule B - Pump Station No. 9 Upgrades a. The new pump station will include two non-clog submersible sewage pumps to replace the existing pumps, rails, bases, diesel backup generator system and roof extension, replacement of the existing electrical building with a new electrical building, instrumentation, electrical power, controls, lighting, piping, valves, fittings, flow meter, coatings, rehabilitation of the existing wet well including new lid and hatches, lining existing wet well, force main, gravity sewer lines, excavation, backfill, grading, concrete site work, ac pavement, fencing, landscaping, abandonment and demolition of existing structures, and any other miscellaneous site improvements. b. Work also includes all temporary structures, dewatering, temporary bypass pumping, incidental piping, power and control facilities to maintain a continuous pump station, all specified delivery acceptance tests and inspections, installed tests and inspections, and operational testing and commissioning. |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |